Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T99CM03095
Permit Details
Apply Date:
06/28/1999
Applicant:
POSTER FROST ASSOC
Description:
SFR
Architects:
- FROST, MARC CAHILL
Completed Inspections
Permit Status: Final
Permit Number: T99CM03095
Permit Description: SFR
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/09/1999 | ROOF NAILING | JRIVA | Approved | IVRS - Inspection 0999* |
11/09/1999 | ROOF NAILING | JRIVA | Approved | ADDTL COMMS - 1. NAIL SHEAR WALL BACK OF HOUSE. 2. PORCH NOT COMPLETE. 3. 7/DT1 NOT COMPLIED WITH. 4. STRAP ALL NON OVER LAPPING CORNERS AT TOP PLATES. 5. STRINGERS MISSING PER TRUSS CALCS. |
11/09/1999 | EXT METAL CLIPS/EXT SHEATHING | JRIVA | Approved | IVRS - Inspection 0999* |
11/09/1999 | EXT METAL CLIPS/EXT SHEATHING | JRIVA | Approved | ADDTL COMMS - DENIED - STOPPED INSPECTION - TO MANY ITEMS. 1. MISSING ANCHOR BOLTS AT 48O.C. AT EXTERIOR FRAME WALL. 2. CLIP BEAM TO POST. 3. FIREBLOCK WOOD WALL AND CLIP TO BOTTOM PLATE. 4. PROVIDE DETAIL FOR TRIPLE 3X8 BEAM TO MASONRY WALL CONNECTION. 5. GAS BOND CANNOT BE INSIDE WALL _______. 6. PROVIDE NAIL PROTECTION FOR PLUMBING WITHIN 1-1/4 OF WALL SURFACE. 7. BEARING STUD IS CUT BY FURNACE. 8. LEDGER BOLTS ARE MISSING NUTS. 9. JOIST HANGERS ARE MISSING NAILS. 10.BEARING BEAM NOT ANCHORED TO THE WALL WITH 5/8 ABS PER 10A, 10B/A3.4. 11.PLAN CALLS FOR SIMPSON PATM 25 PURLIN ANCHORS. DEFORMED SAT 23 STRAPS WERE USED. PROVIDE ENGINEERING REPAIR. 12.NO WINDOWS. 13.FURNACE VENT MUST TERMINATE 1 FOOT ABOVE PARAPET. |