Permit: T99CM03026
Permit Details
Status:
Expired
Type:
COMMERCIAL NEW
Address:
8700 E TANQUE VERDE RD
Address NEW:
8700 E TANQUE VERDE RD
Apply Date:
06/22/1999
Applicant:
EDSTEIN FENTON L L C
Description:
NEW OFFICE BUILDING
Architects:
- SCHEIBE, WAYNE R
Outstanding Activity Conditions
Permit Number - T99CM03026
Permit Status: Expired
Permit Description: NEW OFFICE BUILDING
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/31/1999 | FIRE SPRINKLER UNDERGROUND PIPING PERMIT REQUIRED PRIOR TO FINAL INSPECTIONS. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T99CM03026
Permite Description: NEW OFFICE BUILDING
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/20/2000 | ENGINEERING - FINAL | N/A | Partial Approval | TEMP C/O |
Completed Inspections
Permit Status: Expired
Permit Number: T99CM03026
Permit Description: NEW OFFICE BUILDING
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/10/1999 | PLUMBING - ROUGH, SOIL | TRINIVJR | Approved | ADDTL COMMS - 1. SOIL WATER TEST OK 2. OK TO BACKFILL TRENCH |
| 11/12/1999 | ELECTRIC - UNDERGROUND | RSUBA | Approved | IVRS - Inspection 0000* |
| 11/12/1999 | ELECTRIC - UNDERGROUND | RSUBA | Approved | ADDTL COMMS - 6-2 1/2 2-1 NOTE PLANS WANT I.M.C. STUBS (90 DEGREES) PLEASE CORRECT OR GET LETTER OF APPROVAL FROM ELEC. ENGINEER WHO SEALED THE ELEC DRAWING |
| 11/30/1999 | ELECTRIC - TEMPORARY POLE | KBOLLE | Approved | ADDTL COMMS - OK TO CLEAR TEMP POLE |
| 01/07/2000 | PLUMBING - YARD WTR LINE/TEST | TRINIVJR | Approved | ADDTL COMMS - 1. WASTE AND VENT SYSTEM OK 2. OVERHEAD WATER DISTRIBUION OK 3. CONDENSATE DRAINS OK 4. YARD WATER LINE CONNECTION TO METER OK 5. OK TO BACKFILL. |
| 01/07/2000 | PLUMBING - ABOVE CEILING | TRINIVJR | Approved | ADDTL COMMS - 1. WASTE AND VENT SYSTEM OK 2. OVERHEAD WATER DISTRIBUION OK 3. CONDENSATE DRAINS OK 4. YARD WATER LINE CONNECTION TO METER OK. 5. OK TO BACKFILL. |