Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
C of o
Type:
COMMERCIAL ALTERATION
Apply Date:
07/16/1998
Applicant:
TL ROOF AND ASSOCIATES
Description:
TI:INDUSTRIAL:2ND FLOOR SHELL UNDER T98CM02312
Contractors:
  • TL ROOF AND ASSOCIATES

Completed Inspections

Permit Status: C of o
Permit Number: T98CM03071
Permit Description: TI:INDUSTRIAL:2ND FLOOR SHELL UNDER T98CM02312
Total Completed Inspections - 7
Date Description Inspector Results Comments
10/05/1998 FRAMING DWITT Approved PARTIAL AS NOTED
10/05/1998 FRAMING DWITT Approved ADDTL COMMS - SOUTH, 2ND FLOOR TOILET ROOM: 1. SEAL PENETRATIONS THROUGH FLOOR. 2. SECURE TOP CHORD (FLANGE) OF CEILING JOISTS TO LEDGER. 3. CONFIRM 16 C.C. 4. CONFIRM BRACES/ LOADS AT C.J. 5. COMPLETE FRAME, BLOCKS, ETC.
11/05/1998 FIRE SPKLR - OH PIPING & HYDRO FIRE Approved NEED TEST
11/25/1998 MECHANICAL - FINAL CWILLIAM Approved OK FOR TEMP C/O
11/25/1998 PLUMBING - FINAL TVALENCI Approved OK FOR TEMP C/O
11/25/1998 BUILDING - FINAL DWITT Approved OK FOR TEMP C/O
12/09/1998 SHEET ROCK NAILING DWITT Approved ADDTL COMMS - TAPED BEFORE INSPECTION.

Documents

File Name Document Type  
None DOCUMENTS VIEW