Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T97CM02990
Permit Details
Apply Date:
09/17/1997
Applicant:
U S HOME OF ARIZONA CONSTRUCTION
Description:
SFR:TD#12-33-15
Contractors:
- U S HOME OF ARIZONA CONSTRUCTION
Completed Inspections
Permit Status: Final
Permit Number: T97CM02990
Permit Description: SFR:TD#12-33-15
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/17/1997 | PLUMBING - GAS PRESSURE TEST | LRUDER | Approved | ADDTL COMMS - 1. NAIL SHEAR WALL PANELS IN BATH ROOM #2 PER 15/-8. 2.HAVE STRUCTURAL ENGINEER & C.O.T. APPROVE CHANGE OF HOLDDOWNS IN BATH #2 AP 42 MISSING. 3. PLUMBING H2O LINE LEAK. |
11/18/1997 | EXT METAL CLIPS/EXT SHEATHING | MCAPISTR | Approved | DENIED |
11/18/1997 | EXT METAL CLIPS/EXT SHEATHING | MCAPISTR | Approved | ADDTL COMMS - 1. ADD BLOCKS TO AIR REGISTERS HALL BATH & MASTER BATH. 3. ADD ONE ANCHOR BOLT ON GARAGE WAL -NORTH. 3. ADD ONE ANCHOR BOLT ON GARAGE WAL -NORTH. 4. REPLACE NAIL BANG PLATES WITH FHA STRAPS SIZED FOR LENGTH. 5. ADD FHA STRAPS TO TOP PLATES WHERE GAS LINE WAS CUT IN. 6. ADD NAILING TO REAR SHEAR /OSB PANEL. 7. INSTALL WEDGES MISSING ON REAR TRUSS TAILS. 8. INSTALL LTT 7 HTT ANCHORS PER PLAN. 9. INSTALL WALL CLEAN OUTS PER PLUMBING PLAN. |