Permit Details

Status:
Complete
Type:
Right-of-Way (ROW)
Apply Date:
09/12/2022
Applicant:
Description:
TEP to replace UG cable approx 200ft . TEP trucks may be parked in Street; Work Order: T39908 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.

Completed Inspections

Permit Status: Complete
Permit Number: T22RW03311
Permit Description: TEP to replace UG cable approx 200ft . TEP trucks may be parked in Street; Work Order: T39908 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
Total Completed Inspections - 2
Date Description Inspector Results Comments
11/15/2022 TRSP - ROW - Recurring Passed
01/27/2023 TRSP - ROW - SITE INSPECTION Passed

Documents

File Name Document Type  
T22RW03311 R1.PDF ROW-RIGHT OF WAY VIEW
T22RW03311.PDF ROW-RIGHT OF WAY VIEW