Permit Details
Status:
Final
Type:
Barricade and Excavation
Apply Date:
07/15/2022
Applicant:
TUCSON ELECTRIC POWER **B
Description:
TEP WILL BE WORKING IN ROW TO INSTALL CONDUCTOR IN CONTRACATOR PROVIDED UNDERGROUND DUCT SYSTEM AND SET 1-JUNCTION BOX AND 1-TRANSFORMER AND METER AS PART OF THE DOWNTOWN LINKS PHASE III PROJECT.
** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP.
PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
Documents
File Name |
Document Type |
|
T22RW02527.PDF |
ROW-RIGHT OF WAY |
VIEW
|