Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel12407179C
12407179B
JurisdictionTucson
City of Tucson ZoningC-3, I-1
Tucson WardWard 5
Rio Nuevo Multipurpose Facilities DistrictYes
Major Streets & Routes

Gateway Route

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Annexations & Original City Zoning (OCZ)

Address: 700 E BROADWAY BL
Date - 12/22/2024 6:26 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
1/4 Mile Each Direction (N, E, S, W) 202 None

Rezoning Cases

Date - 12/22/2024 6:26 a.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date
C9-20-11 Sunshine Mile UOD Ordinanced 10/20/2020

Special Development Requests & Requirements

Address: 700 E BROADWAY BL
Date - 12/22/2024 6:26 a.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Unit Type Description
H000000736 CLOSED 08/12/2008 N/A Historical Information

Permits

Address: 700 E BROADWAY BL
Date - 12/22/2024 6:26 a.m.
Total Number Of Permits - (41)
Permit Status Apply Date Expired Date Unit Type Description
TC-COM-1124-02114 Issued 11/04/2024 05/13/2025 Commercial Building separation of power on house panel
T00BU01044 FINAL 04/06/2000 07/08/2001 SPKLR FIRE SPKR:ADD 163
T00BU02609 FINAL 08/28/2000 08/26/2001 WALL/FEN WALL: 125 LF OF 6'HIGH CMU WALL TD#14-72-25
T02BU01498 FINAL 05/22/2002 11/18/2002 TENTS TENT:DEDICATION CEREMONY
T03AN00713 ISSUED 07/23/2003 N/A #200 ADDRNEW
T03BU01295 FINAL 05/22/2003 05/17/2004 BUILD PRE ENGINEERED CARPORTS TD#15-37-10
T03BU02155 FINAL 08/20/2003 05/15/2004 #200 SPKLR SPRINKLERS:NEW & RELOCATE
T03BU02991 FINAL 11/20/2003 09/14/2004 #200 GRADING GRADING:FINAL INSPECTION ONLY
T03CM03667 C OF O 07/23/2003 09/14/2004 #200 COMBO TI:OFFICE
T04OT00398 FINAL 02/26/2004 10/17/2004 #200 SIGN SIGN:6784
T06AN00845 ISSUED 08/09/2006 N/A #100 ADDRNEW
T06AN01172 ISSUED 11/16/2006 N/A #120 ADDRNEW
T06BU02429 FINAL 10/06/2006 06/26/2007 SPKLR 59 NEW HEADS
T06BU02879 WITHDRWN 12/07/2006 07/03/2007 BUILD SHADE STRUCTURE TD # 16-83-39
T06CM00828 FINAL 02/09/2006 12/05/2006 #200 COMBO TI: OFFICE
T06CM04522 C OF O 08/10/2006 07/11/2007 #100 COMBO TI:OFFICE
T06EX00297 CLOSED 02/22/2006 04/23/2006 EXCAV INSTALL 2 POST BARRICADES "BOLLARDS" AS DEPICTED O
T06OT01474 FINAL 06/02/2006 02/24/2007 #200 SIGN 11275
T06OT02079 FINAL 08/10/2006 N/A #100 FLOODPLN FLOODPLAIN USE PERMIT
T07BU00120 FINAL 01/18/2007 10/03/2007 BUILD CARPORT:TD#16-58-43
T07BU00900 FINAL 04/24/2007 10/30/2007 #100 SPKLR Add 5 fire sprinklers
T07CM04533 C OF O 12/05/2007 08/05/2008 #120 COMBO TI:OFFICE
T08BU00130 FINAL 01/25/2008 08/04/2008 #120 SPKLR 22 new sprinkler heads.
T13EX00684 CLOSED 05/15/2013 07/14/2013 EXCAV REMOVE AND REPLACE 10LF OF SEWER PIPE BETWEEN MANHOLES. ASPHALT CUT.
T14BU00935 FINAL 08/19/2014 03/03/2015 #120 SPKLR ADD 2 RELOCATE 4 ON EXISTING FIRE SPRINKLER SYSTEM
T14CM05019 L OF C 08/06/2014 03/09/2015 #120 COMBO TI: REMODEL OFFICE
T18RW02541 FINAL 06/06/2018 08/07/2018 ROW INSTALL CACTI UNDER SNAKE BRIDGE (SOUTH SIDE OF BROADWAY): (3) 5' OCOTILLO (5) 5 GAL. YUCCA (50) 1 GAL. PURPLE PRICKLY PEAR (9) 1 GAL. RED ALOE ALL EXCESS DIRT HAULED OFF
T18RW05651 FINAL 12/21/2018 02/04/2019 ROW ACCESSING MANHOLES AND SEWER REHABILITATION ADDRESS LISTED ON APPLICATION-702 E S BROADWAY
T19RW02288 FINAL 04/25/2019 05/25/2019 ROW REPAIR EXISTING QUADGUARD II IN MEDIAN ISLAND IN FRONT OF ADDRESS JOC #139003
T19RW04166 FINAL 07/29/2019 11/29/2019 ROW DOWNTOWN LINKS PHASE III - SR30N CITY PROJECT MANAGER GREGORY ORSINI, P.E. SURVEY OF EXISTING UTILITIES ALONG NEW PROPOSED DESIGN PATH FROM SR210 BARRAZA-AVIATION PARKWAY TO 6TH STREET.
T20CM03139 FINAL 05/21/2020 12/23/2020 #120 COMBO TI: OFFICE
T20FC00336 FINAL 05/14/2020 12/15/2020 #120 FIRECONS *** NO PLANS *** TI - MODIFICATION TO EXISTING FIRE SPRINKLER SYSTEM
T22RW02527 FINAL 07/15/2022 08/17/2022 ROW TEP WILL BE WORKING IN ROW TO INSTALL CONDUCTOR IN CONTRACATOR PROVIDED UNDERGROUND DUCT SYSTEM AND SET 1-JUNCTION BOX AND 1-TRANSFORMER AND METER AS PART OF THE DOWNTOWN LINKS PHASE III PROJECT. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
T98OT00273 WITHDRWN 11/02/1998 N/A SITE SITE:PARKING LOT
T99BU00945 FINAL 04/08/1999 09/14/2004 GRADING GRADING:1500 CY CUT & 600 CY FILL
T99CM01720 WITHDRWN 04/12/1999 04/17/2000 COMBO TWO PARKING LOT LIGHTS 2- 30 HIGH POLE LIGHTS
T99CM04795 FINAL 10/08/1999 04/04/2007 COMBO TI:SHELL:SITE DEFERRED SUBMITTAL
T99CM05368 WITHDRWN 11/09/1999 N/A COMBO REMODEL:SHELL
T99EL00713 VOID 04/08/1999 N/A ELECT ELECTRIC:
T99EX00228 CLOSED 02/23/1999 04/24/1999 EXCAV EXCAV:STREET CUT & BORE FOR EXPLORATORY MEANS
T99EX00465 CLOSED 05/03/1999 07/02/1999 EXCAV EXCAV:400LF