Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22RW02009
Permit Details
Apply Date:
05/31/2022
Applicant:
Bobby Robbins
Description:
This system improvement project involves the replacement of existing gas facilities along the south; Work Order: 4314870
Conditions
Permit Number - T22RW02009
Permit Status: Complete
Permit Description: This system improvement project involves the replacement of existing gas facilities along the south; Work Order: 4314870
Date | Description | Comments |
---|---|---|
06/17/2022 | June 17, 2022FLOODPLAIN USE PERMIT: TDOT1754PROJECT LOCATION: 7950 E. Speedway Blvd. PROPERTY OWNER: City of Tucson right-of-wayThe applicant is authorized to use a portion of the City of Tucson FEMA AH zone and X-100 zone and City of Tucson Flood Hazard Area (COTFHA) within the unnamed tributaries (including W.A.S.H. Ordinance segment of Udall Wash/ Camino Seco Wash/ Robb Wash Watershed (panel 2302L) specifically described as: a portion Udall Wash/ Camino Seco Wash/ Robb Wash- Floodplain, W.A.S.H. Ordinance public watercourse (City right-of-way), within T14S R15E Sec 09, for the purpose, excavation in the roadway, within floodplain. The applicant agrees to comply with City of Tucson Floodplain and Erosion Hazard, and Watercourse Amenities, Safety and Habitat regulations, and is particularly bound by the conditions stated below. Violation of any of the conditions stated or referred to below, as determined by the City Engineer, shall be grounds for revocation of this permit. Responsibility for renewal of this permit, if necessary, is with the applicant. Issuance of this permit does not constitute a waiver of other requirements contained in the Tucson City Code, Unified Development Code, or any other Federal, State, County, or local regulation. No use other than as permitted herein is allowed. Additional uses allowed under City of Tucson Floodplain and Erosion Hazard Regulations and Watercourse Amenities, Safety, and Habitat regulations require the issuance of an additional Floodplain Use Permit.The following 11 conditions apply to this permit:1)All work shall conform to City of Tucson regulations, this permit and conditions, and plans submitted under the floodplain use permit application. See also associated right-of-way permit T22RW02009 2)Assure construction activity provides vertical and horizontal clearances from all existing utilities including storm drain systems. Contact DTM Engineering Division at (520) 791-3154 for questions.3)This Floodplain Use Permit is specific to area specified in this permit and shall not apply to any other property.4)This Floodplain Use Permit & plans shall be kept in a readily accessible location on construction site at all times.5)Per Department of Transportation & Mobility (DTM) Director, applicant shall notify all buildings/parcels, bounded by a collector or arterial, within a 100-feet of the project extents, of proposed project.6)Temporary stormwater controls are required for any rain events to assure construction pollutants or construction-generated sediment does not enter storm drain systems. Interim sediment and erosion controls shall be used at perimeter of any excavation, trenching, bore holes, bell holes, and / or splice pits, and especially at any existing stormdrain inlets and / or catch basin entrances downstream of project area. Contact DTM Engineering Division Stormwater Management as needed for questions or to arrange for Engineering Inspector at stormwater@tucsonaz.gov or email TucsonFloodErosionInfo@tucsonaz.gov or call (520) 429-4905, reference Floodplain Use Permit number.7)Except as approved by the City Engineer prior to the start of construction, utility construction activities including but not limited to staging areas or material storage under this permit shall not obstruct, retard or divert the existing flow of floodwaters from or to adjacent properties nor obstruct storm drain systems.8)This permit does not permit illicit discharges into the City of Tucson stormdrain system (streets, washes, or other conveyance areas). For any spills or discharges from construction activity, immediately report to ADEQ 602-771-2330 or (800) 234-5677 and contact City of Tucson Stormwater Management at stormwater@tuconaz.gov or call (520) 791-5100.9)Any additional or future disturbance of the floodplain or erosion hazard setback areas shall have separate floodplain use permit applications submitted to this office for review and approval.10)Extension or renewal of the permit may occur only with Tucson Floodplain Administration's approval. Free extensions may be issued if requested prior to expiration date.11)At finished construction, assure any remaining interim erosion and sediment controls have been removed for the area of project, and all construction material debris has been removed. APPLICANT CONTACT:Christian Malena CONTRACTOR:CONTRACTOR ADDRESS:CONTRACTOR E-MAIL / PHONE:Christian.Malena@swgas.com SIGNATURE OF APPLICANT DATEApplicant is authorized by City Engineer to receive this floodplain use permit TDOT1754 subject to above referenced conditions and restrictions. | |
11/17/2022 | The following extended traffic control set-up times were approved: | |
11/18/2022 | Holiday Restrictions | |
11/17/2022 | Traffic/Mobility Control Plan (MCP) approved with conditions. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22RW02009
Permite Description: This system improvement project involves the replacement of existing gas facilities along the south; Work Order: 4314870
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/18/2022 | TRSP - ROW - Recurring | N/A | Complete (Recurring) | Spoke with NPL foreman. Boring will be complete today. Road will be reduced to the one lane by 3 o’clock. |
Completed Inspections
Permit Status: Complete
Permit Number: T22RW02009
Permit Description: This system improvement project involves the replacement of existing gas facilities along the south; Work Order: 4314870
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/06/2023 | TRSP - ROW - SITE INSPECTION | Passed |