Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Final
Type:
Barricade Only
Apply Date:
03/16/2022
Applicant:
COX COMMUNICATIONS
Description:
Barricade placement - Needed for Slurry ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
Contractors:
  • OPTIMUM AZ INC

Documents

File Name Document Type  
T22RW00994.PDF ROW-RIGHT OF WAY VIEW