Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 360 W BLACKLIDGE DR
Search
Parcel Attributes
Parcel | 10711156C 10711156A |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | C-2 |
Tucson Ward | Ward 3 |
Tucson Registered Neighborhood | Coronado Heights |
Major Streets & Routes | Gateway Route |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Annexations & Original City Zoning (OCZ)
Address: 360 W BLACKLIDGE DR
Date - 11/15/2024 3:31 p.m.
Total Number Of Annexations & Original City Zoning (1)
Special Development Requests & Requirements
Address: 360 W BLACKLIDGE DR
Date - 11/15/2024 3:31 p.m.
Total Number Of Special Development Permits - (1)
Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
H000007378 | CLOSED | 08/14/2015 | N/A | Historical Information |
Permits
Address: 360 W BLACKLIDGE DR
Date - 11/15/2024 3:31 p.m.
Total Number Of Permits - (2)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T21RW03357 | FINAL | 07/15/2021 | 02/01/2022 | ROW | TIE IN from TEP pole West of 360 W BLACKLIDGE DR Head E and begin 352' of 144ct fiber overlash, Riser down Pole.Begin 50' Trench/Bore heading E Placing 144ct fiber, Place 4'x4' pothhole and new Cox Vault. continue 450' Trench/bore heading S placing 144ct Fiber, Place 4'x4' pothole and new Cox Vault. From new vault begin 210' Pull through existing conduit 144ct Fiber Heading S, Place 4'x4' pothole and new Cox Vault. Begin 75' Trech/Bore Heading E placing 144ct fiber.Place 4'x4' pothole and New Cox Vault, Head N TRENCH 3' TO CONNECT VAULTS WITH A 2'' CONDUIT. Tie into existing vault. Proof of notification is required at the time of the preconstruction meeting. | |
T22RW00994 | FINAL | 03/16/2022 | 08/09/2022 | ROW | Barricade placement - Needed for Slurry ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |