Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel10711156C
10711156A
JurisdictionTucson
City of Tucson ZoningC-2
Tucson WardWard 3
Tucson Registered NeighborhoodCoronado Heights
Major Streets & Routes

Gateway Route

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Annexations & Original City Zoning (OCZ)

Address: 360 W BLACKLIDGE DR
Date - 11/15/2024 3:31 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-59-19 North To Roger Rd. And East To Kolb Rd. 1895 1957

Special Development Requests & Requirements

Address: 360 W BLACKLIDGE DR
Date - 11/15/2024 3:31 p.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Unit Type Description
H000007378 CLOSED 08/14/2015 N/A Historical Information

Permits

Address: 360 W BLACKLIDGE DR
Date - 11/15/2024 3:31 p.m.
Total Number Of Permits - (2)
Permit Status Apply Date Expired Date Unit Type Description
T21RW03357 FINAL 07/15/2021 02/01/2022 ROW TIE IN from TEP pole West of 360 W BLACKLIDGE DR Head E and begin 352' of 144ct fiber overlash, Riser down Pole.Begin 50' Trench/Bore heading E Placing 144ct fiber, Place 4'x4' pothhole and new Cox Vault. continue 450' Trench/bore heading S placing 144ct Fiber, Place 4'x4' pothole and new Cox Vault. From new vault begin 210' Pull through existing conduit 144ct Fiber Heading S, Place 4'x4' pothole and new Cox Vault. Begin 75' Trech/Bore Heading E placing 144ct fiber.Place 4'x4' pothole and New Cox Vault, Head N TRENCH 3' TO CONNECT VAULTS WITH A 2'' CONDUIT. Tie into existing vault. Proof of notification is required at the time of the preconstruction meeting.
T22RW00994 FINAL 03/16/2022 08/09/2022 ROW Barricade placement - Needed for Slurry ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 50’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.