Status:
Needs Resubmittal
Type:
Commercial Building
Apply Date:
10/20/2022
Applicant:
mariel grace
Description:
Ground-up car wash tunnel and associated facilities

Permit Reviews

Permit Number - T22CM08170
Permit Status: Needs resubmittal
Permit Description: Ground-up car wash tunnel and associated facilities
Start Date Submittal Complete Date Status  
10/20/2022 3RD PARTY REVIEW - COMMERCIAL 10/20/2022 ACTIVE Review Details
05/23/2024 COMMERCIAL REVIEW - FULL v.1 06/04/2024 APPROVED Review Details
02/15/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/28/2024 REQUIRES RESUBMIT Review Details
10/31/2022 COMMERCIAL REVIEW - FULL v.1 11/14/2023 REQUIRES RESUBMIT Review Details
09/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/13/2024 REQUIRES RESUBMIT Review Details
01/18/2024 RESTAMP - COMMERCIAL v.1 01/25/2024 APPROVED Review Details
12/05/2023 RESTAMP - COMMERCIAL v.1 12/05/2023 APPROVED Review Details
03/04/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 03/15/2024 APPROVED Review Details
04/08/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 04/16/2024 REQUIRES RESUBMIT Review Details
03/20/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/28/2024 REQUIRES RESUBMIT Review Details
11/30/2023 COMMERCIAL REVIEW - FULL v.2 12/05/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T22CM08170
Permit Status: Needs resubmittal
Permit Description: Ground-up car wash tunnel and associated facilities
Total Outstanding Activity Conditions - 1
Date Name
12/01/2023 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.

Conditions

Permit Number - T22CM08170
Permit Status: Needs resubmittal
Permit Description: Ground-up car wash tunnel and associated facilities
Date Description Comments
12/01/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
12/01/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/28/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
12/01/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/01/2023 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
12/01/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
12/01/2023 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
12/01/2023 Masonry Inspection Report submittal review is required.
03/20/2024 Vacuume SystemDesigns must be submitted and approved prior to final.
12/01/2023 Post-Installed Anchor Inspection Report is required.
07/28/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/01/2023 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
06/04/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
12/01/2023 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Needs Resubmittal
Permit Number: T22CM08170
Permite Description: Ground-up car wash tunnel and associated facilities
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
04/03/2024 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass 4/3/24: Rebar for building stem walls is in place and properly tied. Okay to pour concrete.
05/22/2024 COT - HCEL - Electrical Underground N/A Partial Pass 5/22/24: underground for two light poles on north side of property okay
05/10/2024 COT - HCEL - Electrical Intermediate N/A Partial Pass 5/10/24: okay to backfill underground electrical for vacuum columns And vacuum inclosure
06/11/2024 COT - HCBU - Exterior Clips/Sheathing N/A Partial Pass 6/11/24: partial for interior framing waiting on RFI for 6x6 post substitute hood down.
03/13/2024 COT - HCPL - Sewer N/A Partial Pass 3/13/24: okay to shade and backfill sewer
02/21/2024 COT - HCPL - Rough Soil N/A Partial Pass 2/21/24: partial 30' Outside of building to the east water main riser
04/03/2024 COT - HCBU - Stem Wall/Retaining Wall N/A Partial Pass 4/3/24: Rebar for building stem walls is in place and properly tied. Okay to pour concrete.
06/21/2024 COT - HCME - Mechanical Intermediate N/A Partial Pass 6/21/24: hard duct at office area per plan ok to proceed with insulation.
06/25/2024 COT - HCPL - Plumbing Above Ceiling N/A Canceled 6/25/24: canceled per contractor
09/06/2024 ENGR Engineering Final N/A Not Ready This job has too much exterior work going on to even think about an engineering inspection yet. This site needs to be customer ready to consider a final inspection.
09/05/2024 COT - HCBU - Building Final N/A Not Ready 9/4/24: not ready needed information

Completed Inspections

Permit Status: Needs Resubmittal
Permit Number: T22CM08170
Permit Description: Ground-up car wash tunnel and associated facilities
Total Completed Inspections - 28
Date Description Inspector Results Comments
03/20/2024 COT - HCEL - Grounding/Bonding Passed
04/16/2024 COT - LCPL - Yard Water Line Passed
05/06/2024 COT - HCBU - Preslab Passed Trench drain forms are set with angle iron for grating properly secured to form. Rebar reinforcement is properly supported off of ground and wired together. Okay to pour concrete for slab.
05/29/2024 COT - HCBU - Masonry Pregrout Passed 5/29/24: vacuum inclosure in northwest corner okay to grout and cap
06/18/2024 COT - HCBU - Roof Nailing Passed
06/18/2024 COT - HCBU - Framing Passed
06/21/2024 COT - HCPL - Plumbing Roof Drains Passed 6/20/24: not ready supports not per plan, not under test.
6/21/24: passed
07/19/2024 COT - HCBU - Interior Shear Bracing Passed
07/19/2024 COT - HCBU - Excavation/Rebar/Zoning Passed 7/19/24: okay to place concrete for two light posts south of building
07/19/2024 COT - HCEL - Electrical Underground Passed 7/19/24: okay to back fill for two light post south of building.
08/05/2024 COT - HCEL - Electrical Intermediate Passed
08/05/2024 COT - HCBU - Exterior Clips/Sheathing Passed
08/05/2024 COT - HCPL - Sewer Passed
08/05/2024 COT - HCPL - Rough Soil Passed
08/05/2024 COT - HCBU - Stem Wall/Retaining Wall Passed
08/05/2024 COT - HCME - Mechanical Intermediate Passed
08/05/2024 COT - HCPL - Plumbing Intermediate Passed
08/05/2024 COT - HCPL - Plumbing Above Ceiling Passed
08/19/2024 BULD - Electrical Clearance Passed TEP ECO
08/26/2024 COT - HCBU - Building Above Ceiling Passed 8/26/24: Grid ceiling framing is installed, electrical lights are installed and wired to the structure, mechanical ductwork and registers are installed. Okay to proceed with installation of ceiling tiles.
08/26/2024 COT - HCME - Mechanical Above Ceiling Passed 8/26/24: Grid ceiling framing is installed, electrical lights are installed and wired to the structure, mechanical ductwork and registers are installed. Okay to proceed with installation of ceiling tiles.
08/26/2024 COT - HCEL - Electrical Above Ceiling Passed 8/26/24: Grid ceiling framing is installed, electrical lights are installed and wired to the structure, mechanical ductwork and registers are installed. Okay to proceed with installation of ceiling tiles.
09/06/2024 COT - HCME - Mechanical Final Passed
09/06/2024 COT - FCON - Fire - Final Passed
09/06/2024 COT - HCPL - Plumbing Final Passed
09/06/2024 COT - HCEL - Electrical Final Passed
09/09/2024 COT - HCEL - Outdoor Lighting Passed Outdoor lighting is properly installed and operational per plans and City regulations.
09/13/2024 COT - HCBU - Building Final Passed

Documents

File Name Document Type  
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
CONS-REVISED MECH - PLUMB SHEETS_V1.PDF DOCUMENTS VIEW
TRUSS SHOP DRAWINGS - CALCULATIONS_V1.PDF DOCUMENTS VIEW
VACUUM DEFERRED SUBMITTAL-REVIEWED_V2_V1.PDF DOCUMENTS VIEW
2354 084113-1 STOREFRONT REVIEWED_V1.PDF DOCUMENTS VIEW
POS CANOPY CALC_SEALED SUBMITTAL_V1.PDF DOCUMENTS VIEW
POS CANOPY DWGS_SEALED SUBMITTAL_V1.PDF DOCUMENTS VIEW
CONS-MISTER CAR WASH HOUGHTON_BUILDING SET_V1.PDF DOCUMENTS VIEW
CONS-1_PLAN_V1.PDF DOCUMENTS VIEW
CONS-2_MCW HOUGHTON BUILDING SET_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
7471 S HOUGHTON RD_VALIDATION FROM PIMA COUNTY_V1.PDF DOCUMENTS VIEW
ADDRES REQUEST NARRATIVE_2401-11_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD_V1.PDF DOCUMENTS VIEW
CONS-MISTER CAR WASH HOUGHTON_BUILDING SET_V1.PDF DOCUMENTS VIEW
RECORDED PLAT_V1.PDF DOCUMENTS VIEW
1_ GEOTECHNICAL REPORT_V1.PDF DOCUMENTS VIEW
1_COMCHECK_V1.PDF DOCUMENTS VIEW
1_STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
CONS-1_PLAN_V1.PDF DOCUMENTS VIEW
CONS-2_MCW HOUGHTON BUILDING SET_V1.PDF DOCUMENTS VIEW
1_ GEOTECHNICAL REPORT_V1.PDF DOCUMENTS VIEW
1_COMCHECK_V1.PDF DOCUMENTS VIEW
1_STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
CONS-1_PLAN_V1.PDF DOCUMENTS VIEW
CONS-2_MCW HOUGHTON BUILDING SET_V1.PDF DOCUMENTS VIEW
1_ GEOTECHNICAL REPORT_V1.PDF DOCUMENTS VIEW
1_COMCHECK_V1.PDF DOCUMENTS VIEW
1_STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
2_HOUGHTON SPECIAL INSPECTION CERTIFICATE-2023-11-29_V1.PDF DOCUMENTS VIEW
2_OUTDOOR LIGHTING CERTIFICATE_V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_CALCS_STRUCT_V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_ENER_ENVELOPE_V1.PDF DOCUMENTS VIEW
STANTEC_APPROVED_GEOTECH_V1.PDF DOCUMENTS VIEW
1_ GEOTECHNICAL REPORT_V1.PDF DOCUMENTS VIEW
1_COMCHECK_V1.PDF DOCUMENTS VIEW
1_COMMERCIAL_SUBMITTAL_REQUIREMENTS_CHECKLIST_V1.PDF DOCUMENTS VIEW
1_STRUCTURAL CALCULATIONS_V1.PDF DOCUMENTS VIEW
APPLICATION_V1.PDF DOCUMENTS VIEW
CONS-1_PLAN_V1.PDF DOCUMENTS VIEW
PSA_V1.PDF DOCUMENTS VIEW