Permit: T22CM08170

Parcel: 141176810


Addresses:

7471 S HOUGHTON RD


Inspection Status: Canceled

Inspection History: COT - HCBU - Excavation/Rebar/Zoning 

Permit Number - T22CM08170

Inspection Description - COT - HCBU - Excavation/Rebar/Zoning 

Inspection Status - Canceled

Date Description Inspector Results Comments
02/29/2024 COT - HCBU - Excavation/Rebar/Zoning  Canceled 2/29/24: canceled per contractor
03/01/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 3/1/24: car wash tunnel trench okay to place concrete for footings
COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 2/29/24: canceled per contractor
3/1/24: car wash tunnel trench okay to place concrete for footings
2/18/24: building footing reinforcement per plan ok to proceed.
03/20/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 3/20/24: building footing okay to pour
03/21/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 3/21/24: tunnel trench okay to pour
04/03/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 4/3/24: Rebar for building stem walls is in place and properly tied. Okay to pour concrete.
04/22/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 4/22/24: partial for west side of car wash foundation
04/24/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 4/24/24: east side of tunnel area okay to place concrete
04/30/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 4/30/24: office area and four footings for pos canopy okay to place concrete
05/06/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass Trench drain forms are set with angle iron for grating properly secured to form. Rebar reinforcement is properly supported off of ground and wired together. Okay to pour concrete for slab.
05/08/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 5/8/24: Footings for vacuum canopies are properly dug, electrical conduit and vacuum piping are properly installed, and rebar reinforcement cages are properly installed and supported off of ground. Okay to pour concrete for columns.
05/10/2024 COT - HCBU - Excavation/Rebar/Zoning  Partial Pass 5/10/24: okay to place concrete for vacuum footings And vacuum inclosure
05/17/2024 COT - HCBU - Excavation/Rebar/Zoning  Passed
05/22/2024 COT - HCBU - Excavation/Rebar/Zoning  Not Ready
06/10/2024 COT - HCBU - Excavation/Rebar/Zoning  Canceled
07/19/2024 COT - HCBU - Excavation/Rebar/Zoning  Passed 7/19/24: okay to place concrete for two light posts south of building