Permit: T22CM08154
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
825 E HEDRICK DR
Address NEW:
825 E HEDRICK DR
Apply Date:
10/20/2022
Applicant:
Description:
Renovate SFR and 2 Bedroom & Bath Addition
Permit Reviews
Permit Number - T22CM08154
Permit Status: Complete
Permit Description: Renovate SFR and 2 Bedroom & Bath Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/20/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 10/20/2022 | ACTIVE |
| 12/29/2022 | RESIDENTIAL NEW DWELLING v.1 | 01/30/2023 | APPROVED |
| 05/31/2023 | RESIDENTIAL NEW DWELLING v.1 | 06/23/2023 | APPROVED |
| 10/31/2022 | RESIDENTIAL NEW DWELLING v.1 | 11/14/2022 | REQUIRES RESUBMIT |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM08154
Permit Description: Renovate SFR and 2 Bedroom & Bath Addition
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2023 | COT - RSPL - Rough Soil | Passed | Approved. Okay to backfill. Shading required. 5/11/2023 | |
| 05/17/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar per plans okay for concrete placement in footings and slab. 5/17/2023 | |
| 05/17/2023 | COT - RSEL - Temporary Service | Passed | Clearance for TEP TMPP only. Construction only not occupancy allowed. 5/17/2023 | |
| 05/17/2023 | COT - RSBU - Preslab | Passed | Rebar per plans okay for concrete placement in footings and slab. 5/17/2023 | |
| 06/12/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/12/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 07/20/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 07/20/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
| 10/26/2023 | COT - RSME - Mechanical Final | Passed | ||
| 10/27/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 10/27/2023 | COT - BULD - SWG Clearance | Passed | 10/27/23: SWG clearance. | |
| 10/27/2023 | BULD - Electrical Clearance | Passed | ||
| 10/27/2023 | COT - RSEL - Electrical Final | Passed | 10/26/23: electrical circuits for garbage disposal, laundry room and exterior receptacles not working. Missing receptacle for double vanity at master bedroom. Clean outs on west side of home need to be cut to grade. Uni strut for gas line is not securely fastened to house. Bonding is required for gas (and water if not pex but pex is not indicated inside of main panel at this time) 10/27/23: corrections made. |
|
| 10/27/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 11/09/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 11/09/2023 | RSBU - Building Final | Passed |