Permit: T22CM08148
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
4501 E SPEEDWAY BL
Address NEW:
4501 E SPEEDWAY BL
Apply Date:
10/20/2022
Applicant:
Description:
Ground Up Construction, including Site Work of Single Story, 2 Service Bay Take 5 Oil Change with re
Permit Reviews
Permit Number - T22CM08148
Permit Status: Complete
Permit Description: Ground Up Construction, including Site Work of Single Story, 2 Service Bay Take 5 Oil Change with re
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/20/2022 | COMMERCIAL - NEW | 10/20/2022 | ACTIVE |
| 03/03/2023 | COMMERCIAL REVIEW - FULL v.2 | 04/10/2023 | APPROVED |
| 05/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 05/13/2024 | APPROVED |
| 04/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/01/2024 | REQUIRES RESUBMIT |
| 10/28/2022 | COMMERCIAL REVIEW - FULL v.1 | 12/12/2022 | REQUIRES RESUBMIT |
| 04/10/2023 | RESTAMP - COMMERCIAL v.1 | 04/11/2023 | APPROVED |
Conditions
Permit Number - T22CM08148
Permit Status: Complete
Permit Description: Ground Up Construction, including Site Work of Single Story, 2 Service Bay Take 5 Oil Change with re
| Date | Description | Comments |
|---|---|---|
| 04/12/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 04/12/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 04/05/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
| 04/12/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 04/12/2024 | This project requires the completion of a Fire Operational Permit PRIOR TO FINALING this permit. | |
| 04/12/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 04/12/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM08148
Permite Description: Ground Up Construction, including Site Work of Single Story, 2 Service Bay Take 5 Oil Change with re
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/19/2023 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | for pits only |
| 04/09/2024 | COT - HCPL - Plumbing Roof Drains | N/A | Not Applicable | |
| 04/10/2024 | ENGR Engineering Final | N/A | Canceled | three Engineering inspections called in. |
| 04/10/2024 | COT - FCON - Fire - Final | N/A | Partial Pass | Exit discharge lights shall function with A/C power loss. OK for level2 TCO. Shall obtain operational permit for repair garage. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM08148
Permit Description: Ground Up Construction, including Site Work of Single Story, 2 Service Bay Take 5 Oil Change with re
Total Completed Inspections - 27
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/28/2023 | COT - HCBU - Preslab | Passed | ||
| 04/28/2023 | COT - HCEL - Grounding/Bonding | Passed | ||
| 08/07/2023 | COT - HCBU - Roof Nailing | Passed | ||
| 08/07/2023 | COT - HCBU - Framing | Passed | ||
| 08/09/2023 | COT - HCPL - Plumbing Intermediate | Passed | North and South walls, Bay Area. | |
| 08/25/2023 | COT - HCEL - Electrical Intermediate | Passed | ||
| 08/25/2023 | COT - HCBU - Building Above Ceiling | Passed | ||
| 08/25/2023 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 08/25/2023 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 08/25/2023 | COT - HCPL - Plumbing Progress | Passed | ||
| 08/25/2023 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 08/25/2023 | COT - HCME - Mechanical Intermediate | Passed | ||
| 11/27/2023 | COT - HCEL - Electrical Underground | Passed | ||
| 12/01/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 12/20/2023 | COT - HCPL - Sewer | Passed | ||
| 03/06/2024 | COT - HCPL - Yard Water Line | Passed | ||
| 04/09/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 04/09/2024 | COT - HCEL - Outdoor Lighting | Passed | ||
| 04/10/2024 | COT - HCPL - Rough Soil | Passed | ||
| 04/10/2024 | COT - HCBU - Building Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Both restrooms are equipped with ADA grab bars and pipe protectors. Electrical panel is properly labeled. Okay to issue a Level 2 Temporary Certificate of Occupancy. | |
| 04/10/2024 | COT - HCEL - Electrical Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Both restrooms are equipped with ADA grab bars and pipe protectors. Electrical panel is properly labeled. Okay to issue a Level 2 Temporary Certificate of Occupancy. | |
| 04/10/2024 | COT - HCPL - Plumbing Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Both restrooms are equipped with ADA grab bars and pipe protectors. Electrical panel is properly labeled. Okay to issue a Level 2 Temporary Certificate of Occupancy. | |
| 04/10/2024 | COT - HCME - Mechanical Final | Passed | Construction, mechanical, electrical, and plumbing work is complete. Both restrooms are equipped with ADA grab bars and pipe protectors. Electrical panel is properly labeled. Okay to issue a Level 2 Temporary Certificate of Occupancy. | |
| 04/15/2024 | ENGR Engineering Final | Passed | ||
| 04/17/2024 | COT - FCON - Fire - Final | Passed | ||
| 04/18/2024 | COT - HCBU - TCO | Passed | Recommend issuing C of O. | |
| 04/18/2024 | SITE - Zoning Final | Passed |