Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
4501 E SPEEDWAY BL
Apply Date:
10/20/2022
Applicant:
Description:
Ground Up Construction, including Site Work of Single Story, 2 Service Bay Take 5 Oil Change with re

Permit Reviews

Permit Number - T22CM08148
Permit Status: Complete
Permit Description: Ground Up Construction, including Site Work of Single Story, 2 Service Bay Take 5 Oil Change with re
Start Date Submittal Complete Date Status  
10/20/2022 COMMERCIAL - NEW 10/20/2022 ACTIVE Review Details
03/03/2023 COMMERCIAL REVIEW - FULL v.2 04/10/2023 APPROVED Review Details
05/10/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 05/13/2024 APPROVED Review Details
04/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/01/2024 REQUIRES RESUBMIT Review Details
10/28/2022 COMMERCIAL REVIEW - FULL v.1 12/12/2022 REQUIRES RESUBMIT Review Details
04/10/2023 RESTAMP - COMMERCIAL v.1 04/11/2023 APPROVED Review Details

Conditions

Permit Number - T22CM08148
Permit Status: Complete
Permit Description: Ground Up Construction, including Site Work of Single Story, 2 Service Bay Take 5 Oil Change with re
Date Description Comments
04/12/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
04/12/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/05/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
04/12/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/12/2024 This project requires the completion of a Fire Operational Permit PRIOR TO FINALING this permit.
04/12/2024 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
04/12/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM08148
Permite Description: Ground Up Construction, including Site Work of Single Story, 2 Service Bay Take 5 Oil Change with re
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
04/19/2023 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass for pits only
04/09/2024 COT - HCPL - Plumbing Roof Drains N/A Not Applicable
04/10/2024 ENGR Engineering Final N/A Canceled three Engineering inspections called in.
04/10/2024 COT - FCON - Fire - Final N/A Partial Pass Exit discharge lights shall function with A/C power loss. OK for level2 TCO. Shall obtain operational permit for repair garage.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM08148
Permit Description: Ground Up Construction, including Site Work of Single Story, 2 Service Bay Take 5 Oil Change with re
Total Completed Inspections - 27
Date Description Inspector Results Comments
04/28/2023 COT - HCBU - Preslab Passed
04/28/2023 COT - HCEL - Grounding/Bonding Passed
08/07/2023 COT - HCBU - Roof Nailing Passed
08/07/2023 COT - HCBU - Framing Passed
08/09/2023 COT - HCPL - Plumbing Intermediate Passed North and South walls, Bay Area.
08/25/2023 COT - HCEL - Electrical Intermediate Passed
08/25/2023 COT - HCBU - Building Above Ceiling Passed
08/25/2023 COT - HCEL - Electrical Above Ceiling Passed
08/25/2023 COT - HCPL - Plumbing Above Ceiling Passed
08/25/2023 COT - HCPL - Plumbing Progress Passed
08/25/2023 COT - HCME - Mechanical Above Ceiling Passed
08/25/2023 COT - HCME - Mechanical Intermediate Passed
11/27/2023 COT - HCEL - Electrical Underground Passed
12/01/2023 BULD - Electrical Clearance Passed TEP ECO
12/20/2023 COT - HCPL - Sewer Passed
03/06/2024 COT - HCPL - Yard Water Line Passed
04/09/2024 COT - HCBU - Interior Shear Bracing Passed
04/09/2024 COT - HCEL - Outdoor Lighting Passed
04/10/2024 COT - HCPL - Rough Soil Passed
04/10/2024 COT - HCBU - Building Final Passed Construction, mechanical, electrical, and plumbing work is complete. Both restrooms are equipped with ADA grab bars and pipe protectors. Electrical panel is properly labeled. Okay to issue a Level 2 Temporary Certificate of Occupancy.
04/10/2024 COT - HCEL - Electrical Final Passed Construction, mechanical, electrical, and plumbing work is complete. Both restrooms are equipped with ADA grab bars and pipe protectors. Electrical panel is properly labeled. Okay to issue a Level 2 Temporary Certificate of Occupancy.
04/10/2024 COT - HCPL - Plumbing Final Passed Construction, mechanical, electrical, and plumbing work is complete. Both restrooms are equipped with ADA grab bars and pipe protectors. Electrical panel is properly labeled. Okay to issue a Level 2 Temporary Certificate of Occupancy.
04/10/2024 COT - HCME - Mechanical Final Passed Construction, mechanical, electrical, and plumbing work is complete. Both restrooms are equipped with ADA grab bars and pipe protectors. Electrical panel is properly labeled. Okay to issue a Level 2 Temporary Certificate of Occupancy.
04/15/2024 ENGR Engineering Final Passed
04/17/2024 COT - FCON - Fire - Final Passed
04/18/2024 COT - HCBU - TCO Passed Recommend issuing C of O.
04/18/2024 SITE - Zoning Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
FINAL TESTING - INSPECTION PACKAGE-2024-05-10_V2.PDF DOCUMENTS VIEW
COFO_TEMPORARYCOFO.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-TAKE 5 - TUCSON SPEEDWAY REV 01 - 02.22.2023_V2.PDF DOCUMENTS VIEW
CONS-TAKE 5 - TUCSON SPEEDWAY REV 01 - 02.22.2023_V2.PDF DOCUMENTS VIEW
CONS-TAKE 5 - TUCSON SPEEDWAY REV 01 - 02.22.2023_V2.PDF DOCUMENTS VIEW
CONS-TAKE 5 - TUCSON SPEEDWAY REV 01 - 02.22.2023_V2.PDF DOCUMENTS VIEW
REV1 DP - HEAVY COMMERCIAL PLUMBING RESPONSE_V1.PDF DOCUMENTS VIEW
TUCSON SPEEDWAY BUILDING REVIEW COMMENTS RESPONSES_V1.PDF DOCUMENTS VIEW
REV1 DP - SITE ZONING RESPONSE_V1.PDF DOCUMENTS VIEW
ASBESTOS SURVEY.TERRACON.63217139_V1.PDF DOCUMENTS VIEW
GEO_V1.PDF DOCUMENTS VIEW
LAND TITLE SURVEY_V1.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS PACKET_V1.PDF DOCUMENTS VIEW
APPLICATION_V1.PDF DOCUMENTS VIEW