Permit: T22CM08057
Permit Details
Status:
Inspections Complete
Type:
Residential Building - One or Two Family
Address:
912 W CUSHING ST
Address NEW:
912 W CUSHING ST
Apply Date:
10/19/2022
Applicant:
Description:
Single Family Residence
Permit Reviews
Permit Number - T22CM08057
Permit Status: Inspections complete
Permit Description: Single Family Residence
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/19/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 10/20/2022 | ACTIVE |
| 07/03/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/17/2023 | APPROVED |
| 10/31/2022 | RESIDENTIAL NEW DWELLING v.1 | 11/15/2022 | REQUIRES RESUBMIT |
| 01/04/2023 | RESIDENTIAL NEW DWELLING v.2 | 02/15/2023 | APPROVED |
| 08/14/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/16/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM08057
Permit Status: Inspections complete
Permit Description: Single Family Residence
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 02/02/2023 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - T22CM08057
Permit Status: Inspections complete
Permit Description: Single Family Residence
| Date | Description | Comments |
|---|---|---|
| 02/02/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: T22CM08057
Permite Description: Single Family Residence
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2023 | COT - RSBU - Masonry Pregrout | N/A | Partial Pass | Partial pass 4th lift all around. Okay to grout at 16' 6/12/2023 |
| 06/22/2023 | COT - RSBU - Stem Wall/Retaining Wall | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: T22CM08057
Permit Description: Single Family Residence
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/13/2023 | COT - RSPL - Sewer | Passed | Approved. Okay to backfill. Shading required. 4/13/2023 | |
| 04/13/2023 | COT - RSPL - Rough Soil | Passed | Approved. Okay to backfill. Shading required. 4/13/2023 | |
| 04/13/2023 | COT - RSPL - Yard Water Line | Passed | Approved. Okay to backfill. Shading required. 4/13/2023 | |
| 04/19/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 04/19/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 06/16/2023 | COT - RSBU - Masonry Pregrout | Passed | Approved. Final lift. Okay to grout top out. 6/16/2023 | |
| 08/02/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 08/25/2023 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 8/25/2023 | |
| 08/25/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Duplicate inspection. 8/25/2023 | |
| 08/25/2023 | COT - RSBU - Preslab | Passed | Duplicate inspection. Approved. 8/25/2023 | |
| 08/25/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/25/2023 | COT - RSEL - Temporary Service | Passed | Clearance for TEP ECO. 8/25/2023 | |
| 09/12/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | APPROVED. 9/12/2023 | |
| 12/07/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
| 12/28/2023 | COT - BULD - SWG Clearance | Passed | 12/28/2023 clearance for Southwest Gas. | |
| 02/13/2024 | COT - FCON - Sprinkler - Final | Passed | ||
| 02/13/2024 | COT - RSEL - Electrical Final | Passed | ||
| 02/13/2024 | COT - RSME - Mechanical Final | Passed | ||
| 02/13/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 02/13/2024 | RSBU - Building Final | Passed | ||
| 02/13/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/30/2024 | ENGR Engineering Final | Passed |