Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
10/18/2022
Applicant:
Celina Rodriguez
Description:
SFR BT2685-228 T22-M0012

Outstanding Activity Conditions

Permit Number - T22CM07992
Permit Status: Issued
Permit Description: SFR BT2685-228 T22-M0012
Total Outstanding Activity Conditions - 2
Date Name
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - T22CM07992
Permit Status: Issued
Permit Description: SFR BT2685-228 T22-M0012
Date Description Comments
10/18/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
10/18/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
10/18/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/18/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2021-034(P21WP00207) IS ACCEPTED AND RELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM07992
Permite Description: SFR BT2685-228 T22-M0012
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSPL - Yard Water Line N/A Not Ready
10/26/2022 COT - RSPL - Sewer N/A Not Ready
10/26/2022 COT - RSPL - Rough Soil N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM07992
Permit Description: SFR BT2685-228 T22-M0012
Total Completed Inspections - 20
Date Description Inspector Results Comments
11/04/2022 COT - RSEL - Electrical Underground Passed
11/04/2022 COT - RSBU - Excavation/Rebar/Zoning Passed
11/22/2022 COT - RSBU - Roof Nailing Passed
12/01/2022 COT - RSBU - Exterior Clips/Sheathing Passed
12/13/2022 BULD - Electrical Clearance Passed TEP ECO
12/13/2022 COT - RSEL - Construction Power Passed
01/11/2023 COT - RSPL - Gas Pressure Test Passed
01/11/2023 RSME - Mechanical Progress Passed
01/11/2023 COT - LCBU - Framing Passed
01/11/2023 COT - LCPL - Plumbing Intermediate Passed
01/11/2023 COT - RSEL - Grounding/Bonding Passed
01/13/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/10/2023 COT - HCBU - Interior Shear Bracing Passed
04/03/2023 COT - BULD - SWG Clearance Passed SWG clearance required
04/03/2023 COT - RSPL - Plumbing Final Passed
04/18/2023 ENGR Engineering Final Passed CHECKED THE DRIVE WAY FORMS FOR SLOPE AND FOUND THE NEW GRADES TO BE AT 15.9% WITH THE NEW LAYOUT. ALSO CONSULTED WITH THE CONTRACTOR AND REPRESENTATIVE BELL FROM TDOT ABOUT THIS POUR, THE DRIVEWAY WILL BE POURED ON 4/19/23.
04/18/2023 COT - RSEL - Electrical Final Passed
04/18/2023 COT - RSEL - Outdoor Lighting Passed
04/18/2023 RSBU - Building Final Passed
04/18/2023 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW