Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 04/18/2023 |
ENGR Engineering Final
|
|
Passed |
CHECKED THE DRIVE WAY FORMS FOR SLOPE AND FOUND THE NEW GRADES TO BE AT 15.9% WITH THE NEW LAYOUT. ALSO CONSULTED WITH THE CONTRACTOR AND REPRESENTATIVE BELL FROM TDOT ABOUT THIS POUR, THE DRIVEWAY WILL BE POURED ON 4/19/23. |