Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address NEW:
5102 S LIBERTY AV
Apply Date:
10/11/2022
Applicant:
Description:
R - Installation of a 3.12kW PV system with a Tesla Powerwall + and Tesla Powerwall 2 battery system

Permit Reviews

Permit Number - T22CM07768
Permit Status: Complete
Permit Description: R - Installation of a 3.12kW PV system with a Tesla Powerwall + and Tesla Powerwall 2 battery system
Start Date Submittal Complete Date Status  
10/11/2022 OTHER 10/14/2022 ACTIVE Review Details
03/09/2023 RESIDENTIAL SOLAR v.1 04/07/2023 APPROVED Review Details
11/16/2022 RESIDENTIAL SOLAR v.1 12/01/2022 APPROVED Review Details

Conditions

Permit Number - T22CM07768
Permit Status: Complete
Permit Description: R - Installation of a 3.12kW PV system with a Tesla Powerwall + and Tesla Powerwall 2 battery system
Date Description Comments
10/14/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
10/11/2022 THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM07768
Permite Description: R - Installation of a 3.12kW PV system with a Tesla Powerwall + and Tesla Powerwall 2 battery system
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
04/25/2023 RSEL - Electrical Progress N/A Canceled
04/25/2023 COT - BULD - SWG Clearance N/A Not Applicable
04/25/2023 BULD - Electrical Clearance N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: T22CM07768
Permit Description: R - Installation of a 3.12kW PV system with a Tesla Powerwall + and Tesla Powerwall 2 battery system
Total Completed Inspections - 3
Date Description Inspector Results Comments
05/02/2023 BULD - Electrical Clearance Passed Approved, DGC/BAT clearance to TEP is required - note: DG meter is present
05/02/2023 RSBU - Building Final Passed
05/02/2023 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-TERESA HEDBERG PLAN SET _REV6_ 02-7-2023_V1.PDF DOCUMENTS VIEW
HEDBERG REVISION LETTER (5)_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPLICATION_V1.PDF DOCUMENTS VIEW
CONS-T22CM07768 APPROVED STAMPED_PLANS_V1.PDF DOCUMENTS VIEW