Permit: T22CM07768
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
5102 S LIBERTY AV
Address NEW:
5102 S LIBERTY AV
Apply Date:
10/11/2022
Applicant:
Description:
R - Installation of a 3.12kW PV system with a Tesla Powerwall + and Tesla Powerwall 2 battery system
Permit Reviews
Permit Number - T22CM07768
Permit Status: Complete
Permit Description: R - Installation of a 3.12kW PV system with a Tesla Powerwall + and Tesla Powerwall 2 battery system
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/11/2022 | OTHER | 10/14/2022 | ACTIVE |
| 03/09/2023 | RESIDENTIAL SOLAR v.1 | 04/07/2023 | APPROVED |
| 11/16/2022 | RESIDENTIAL SOLAR v.1 | 12/01/2022 | APPROVED |
Conditions
Permit Number - T22CM07768
Permit Status: Complete
Permit Description: R - Installation of a 3.12kW PV system with a Tesla Powerwall + and Tesla Powerwall 2 battery system
| Date | Description | Comments |
|---|---|---|
| 10/14/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
| 10/11/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM07768
Permite Description: R - Installation of a 3.12kW PV system with a Tesla Powerwall + and Tesla Powerwall 2 battery system
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/25/2023 | RSEL - Electrical Progress | N/A | Canceled | |
| 04/25/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 04/25/2023 | BULD - Electrical Clearance | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM07768
Permit Description: R - Installation of a 3.12kW PV system with a Tesla Powerwall + and Tesla Powerwall 2 battery system
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/02/2023 | BULD - Electrical Clearance | Passed | Approved, DGC/BAT clearance to TEP is required - note: DG meter is present | |
| 05/02/2023 | RSBU - Building Final | Passed | ||
| 05/02/2023 | COT - RSEL - Electrical Final | Passed |