Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
10/05/2022
Applicant:
Andrea Flood
Description:
SFR F40J22 T22-M0022

Permit Reviews

Permit Number - T22CM07657
Permit Status: Complete
Permit Description: SFR F40J22 T22-M0022
Start Date Submittal Complete Date Status  
10/05/2022 OTHER 10/12/2022 COMPLETED Review Details
07/14/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/26/2023 APPROVED Review Details

Conditions

Permit Number - T22CM07657
Permit Status: Complete
Permit Description: SFR F40J22 T22-M0022
Date Description Comments
10/05/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
10/05/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/26/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/26/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/26/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM07657
Permite Description: SFR F40J22 T22-M0022
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
07/17/2023 COT - RSPL - Plumbing Final N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: T22CM07657
Permit Description: SFR F40J22 T22-M0022
Total Completed Inspections - 22
Date Description Inspector Results Comments
11/18/2022 COT - RSPL - Sewer Passed
11/18/2022 COT - RSPL - Yard Water Line Passed
11/18/2022 COT - RSPL - Rough Soil Passed
11/29/2022 COT - RSBU - Preslab Passed
11/29/2022 COT - RSBU - Excavation/Rebar/Zoning Passed
11/29/2022 COT - RSEL - Electrical Underground Passed
11/29/2022 COT - RSEL - Grounding/Bonding Passed
03/15/2023 COT - RSBU - Exterior Clips/Sheathing Passed
04/13/2023 COT - LCPL - Plumbing Intermediate Passed
04/13/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/13/2023 COT - RSEL - Construction Power Passed TEP ECO
04/13/2023 COT - LCBU - Framing Passed
04/13/2023 COT - RSPL - Gas Pressure Test Passed
05/02/2023 COT - HCBU - Interior Shear Bracing Passed
05/02/2023 COT - RSBU - Roof Nailing Passed
07/17/2023 COT - BULD - SWG Clearance Passed 7/17/23: SWG Clearance for meter only.
07/21/2023 RSBU - Building Final Passed
07/21/2023 RSME - Mechanical Progress Passed
07/21/2023 COT - RSEL - Electrical Final Passed
07/21/2023 ENGR Engineering Final Passed Complete the minor drainage work around the site and ensure the drainage patterns have been met through the front yard. Drainage openings.
07/21/2023 COT - RSME - Mechanical Final Passed
07/21/2023 COT - RSEL - Outdoor Lighting Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW