Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
10/01/2022
Applicant:
Description:
SFR RKF55J T21-M0088

Permit Reviews

Permit Number - T22CM07538
Permit Status: Issued
Permit Description: SFR RKF55J T21-M0088
Start Date Submittal Complete Date Status  
10/01/2022 OTHER 10/03/2022 COMPLETED Review Details
10/09/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/10/2023 APPROVED Review Details
09/26/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/27/2023 APPROVED Review Details

Conditions

Permit Number - T22CM07538
Permit Status: Issued
Permit Description: SFR RKF55J T21-M0088
Date Description Comments
10/01/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
10/01/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/07/2022 ISSUED WITH PDEQ CONDITIONS: NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PRIVATE SEWER #P21SD0033 IS ISSUED A DISCHARGE AUTHORIZATION BY PDEQ
10/10/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/10/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/01/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.
09/27/2023 Post-Tension Inspection Report is required.
10/10/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM07538
Permite Description: SFR RKF55J T21-M0088
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM07538
Permit Description: SFR RKF55J T21-M0088
Total Completed Inspections - 26
Date Description Inspector Results Comments
01/10/2023 COT - RSPL - Rough Soil Passed
01/10/2023 COT - RSPL - Yard Water Line Passed
01/10/2023 COT - RSPL - Sewer Passed
01/26/2023 COT - RSBU - Preslab Passed
01/26/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
01/26/2023 COT - RSEL - Electrical Underground Passed
01/26/2023 COT - RSEL - Grounding/Bonding Passed
03/21/2023 COT - RSBU - Roof Nailing Passed
03/27/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
06/07/2023 COT - RSPL - Gas Pressure Test Passed
06/07/2023 COT - LCBU - Framing Passed
06/07/2023 COT - LCPL - Plumbing Intermediate Passed
06/07/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/07/2023 RSME - Mechanical Progress Passed
06/22/2023 COT - HCBU - Interior Shear Bracing Passed
08/04/2023 COT - RSEL - Construction Power Passed
08/04/2023 BULD - Electrical Clearance Passed
09/07/2023 COT - BULD - SWG Clearance Passed
10/06/2023 COT - RSPL - Backwater Valve Passed
10/06/2023 COT - RSPL - Plumbing Final Passed
10/06/2023 COT - RSME - Mechanical Final Passed
10/06/2023 RSBU - Building Final Passed
10/06/2023 COT - RSEL - Outdoor Lighting Passed
10/06/2023 ENGR Engineering Final Passed The rear wall of this site is missing a couple of courses of wall that is blow, their normal standard for rear Walls Which is normally 8 1/2 courses of expose block on this site they only have 6 1/2 courses of expose block
10/06/2023 COT - RSEL - Electrical Final Passed
10/06/2023 COT - FCON - Sprinkler - Final Passed

Documents

File Name Document Type  
220365 - RINCON KNOLLS LOT 274 - PT REPORT-2023-10-09_V1.PDF DOCUMENTS VIEW
CONS-EQ SEWER DA_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW