Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/06/2023 |
ENGR Engineering Final
|
|
Passed |
The rear wall of this site is missing a couple of courses of wall that is blow, their normal standard for rear Walls Which is normally 8 1/2 courses of expose block on this site they only have 6 1/2 courses of expose block |