Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T22CM07535
Permit Details
Apply Date:
09/30/2022
Applicant:
Description:
Repair/replace 3-phase meter base.
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM07535
Permite Description: Repair/replace 3-phase meter base.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - LCEL - Electrical Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM07535
Permit Description: Repair/replace 3-phase meter base.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/06/2023 | COT - LCEL - Electrical Final | Passed | ||
04/06/2023 | BULD - Electrical Clearance | Passed | 3-phase meter base repair, RECN clearance was called into TEP for unit #C at 12:00pm (power-kill) | |
04/06/2023 | COT - LCEL - Service Upgrade | Passed | 3-phase meter base repair, RECN clearance was called into TEP for unit #C |