Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/06/2023 | BULD - Electrical Clearance | Passed | 3-phase meter base repair, RECN clearance was called into TEP for unit #C at 12:00pm (power-kill) |