Permit: T22CM07037
Permit Details
Apply Date:
09/14/2022
Applicant:
Description:
R - Installation of a roof mounted 7.600kW PV System
Permit Reviews
Permit Number - T22CM07037
Permit Status: Issued
Permit Description: R - Installation of a roof mounted 7.600kW PV System
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/14/2022 | OTHER | 09/21/2022 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T22CM07037
Permit Status: Issued
Permit Description: R - Installation of a roof mounted 7.600kW PV System
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
09/20/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Conditions
Permit Number - T22CM07037
Permit Status: Issued
Permit Description: R - Installation of a roof mounted 7.600kW PV System
Date | Description | Comments |
---|---|---|
09/14/2022 | THE INSTALLATION SHALL COMPLY WITH ALL APPLICABLE REQUIREMENTS OF SECTION 605.11.1 THROUGH 605.11.4 OF THE 2012 EDITION OF THE INTERNATIONAL FIRE CODE, THE INTERNATIONAL BUILDING CODE AND NFPA 70. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM07037
Permite Description: R - Installation of a roof mounted 7.600kW PV System
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | RSBU - Building Final | N/A | Not Ready | |
10/27/2022 | COT - RSEL - Electrical Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM07037
Permit Description: R - Installation of a roof mounted 7.600kW PV System
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/16/2022 | BULD - Electrical Clearance | Passed | Approved, DGL/DGC clearance was called into TEP for the line-side tap (power-kill) | |
12/16/2022 | RSBU - Building Final | Passed | Solar | |
12/16/2022 | COT - RSEL - Electrical Final | Passed |