Inspection History Details
Inspection Status: Passed
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/16/2022 | BULD - Electrical Clearance | Passed | Approved, DGL/DGC clearance was called into TEP for the line-side tap (power-kill) |