Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
09/09/2022
Applicant:
Mark Alteri
Description:
SFR CVPLAN3 T22-M0044

Permit Reviews

Permit Number - T22CM06918
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Start Date Submittal Complete Date Status  
09/09/2022 OTHER 10/12/2022 COMPLETED Review Details
06/16/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/26/2023 APPROVED Review Details

Conditions

Permit Number - T22CM06918
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Date Description Comments
09/09/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
09/09/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
12/09/2022 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
09/09/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM06918
Permite Description: SFR CVPLAN3 T22-M0044
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - RSEL - Outdoor Lighting N/A Not Ready
10/26/2022 COT - RSEL - Construction Power N/A Not Ready
04/14/2023 COT - RSBU - Preslab N/A Not Applicable This inspection already passed on 3/23/23
04/14/2023 COT - RSBU - Roof Nailing N/A Re-inspection required renail roof
05/25/2023 RSEL - Electrical Progress N/A Re-inspection required 5/25/2023: missing receptacle at entry to stairwell, missing light in stairwell plans show 4
10/27/2022 RSME - Mechanical Progress N/A Not Ready
05/25/2023 COT - LCBU - Framing N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: T22CM06918
Permit Description: SFR CVPLAN3 T22-M0044
Total Completed Inspections - 20
Date Description Inspector Results Comments
03/15/2023 COT - RSPL - Yard Water Line Passed
03/15/2023 COT - RSPL - Rough Soil Passed
03/20/2023 COT - RSPL - Sewer Passed 3-20-23: Sewer lines is connected to main sewer line with proper clean outs and back water valve. Okay to backfill trenches.
03/23/2023 COT - RSEL - Grounding/Bonding Passed
03/23/2023 COT - RSEL - Electrical Underground Passed
03/23/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
04/25/2023 COT - RSBU - Roof Nailing Passed
04/27/2023 COT - RSBU - Exterior Clips/Sheathing Passed
05/16/2023 BULD - Electrical Clearance Passed TEP ECO
05/25/2023 RSME - Mechanical Progress Passed
05/25/2023 COT - LCPL - Plumbing Intermediate Passed
05/25/2023 COT - RSPL - Gas Pressure Test Passed
09/05/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Approved, items were addressed
07/05/2023 COT - RSBU - Interior Shear Bracing Passed
08/29/2023 COT - BULD - SWG Clearance Passed SWG for meter only
08/31/2023 RSBU - Building Final Passed
08/31/2023 COT - RSEL - Electrical Final Passed
08/31/2023 ENGR Engineering Final Passed
08/31/2023 COT - RSME - Mechanical Final Passed
08/31/2023 COT - RSPL - Plumbing Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PT REPORT LOT 22_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW