Permit: T22CM06845
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
8787 E PLACITA RIO DE VIDRIO
Address NEW:
8787 E PLACITA RIO DE VIDRIO
Apply Date:
09/06/2022
Applicant:
Cassidy Fenton
Description:
SFR 3292T T21-M0060
Permit Reviews
Permit Number - T22CM06845
Permit Status: Complete
Permit Description: SFR 3292T T21-M0060
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/04/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/05/2024 | APPROVED |
| 05/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/15/2024 | APPROVED |
Conditions
Permit Number - T22CM06845
Permit Status: Complete
Permit Description: SFR 3292T T21-M0060
| Date | Description | Comments |
|---|---|---|
| 04/03/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 04/03/2024 | 1: Septic shall have 100 ft setback to wells, 5 ft setback from property line, 50 ft setback from propertyline if no central water source, and 50 ft setback to washes that drains more than 20 acres.2: Approval has been granted solely for a Construction Authorization and/or a Discharge Authorization inaccordance with A.A.C. § R18-9-A301. Construction or discharging without local regulatory approvalfrom Development Services in regard to zoning, grading, flood control and other applicable regulatoryrequirements may result in a violation of local ordinances and subject the applicant to penalties of up to$10,000.00 per instance per day.3: Discharge authorization is required prior to building final inspection or certificate of occupancy. | |
| 04/03/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 04/04/2024 | Post-Tension Inspection Report is required. | |
| 04/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM06845
Permite Description: SFR 3292T T21-M0060
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/24/2023 | RSME - Mechanical Progress | N/A | Not Applicable | N/A |
| 03/24/2023 | COT - LCPL - Plumbing Intermediate | N/A | Not Applicable | N/A |
| 03/24/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 3-24-23: Provide 1" of clearance to combustibles from b-vents. 2-Repair/replace fireblock in Master Bedroom. 3-Return air can not be taken from a bathroom per M1602#4. 4-Fireblock vertically at 10' max spacing on double wall per R302.11#1.1. |
| 03/24/2023 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready | |
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM06845
Permit Description: SFR 3292T T21-M0060
Total Completed Inspections - 23