Inspection Status: Not Ready

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
10/26/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Not Ready
03/24/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 3-24-23: Provide 1" of clearance to combustibles from b-vents. 2-Repair/replace fireblock in Master Bedroom. 3-Return air can not be taken from a bathroom per M1602#4. 4-Fireblock vertically at 10' max spacing on double wall per R302.11#1.1.
03/28/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Canceled
03/30/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 3-24-23: Provide 1" of clearance to combustibles from b-vents. 2-Repair/replace fireblock in Master Bedroom. 3-Return air can not be taken from a bathroom per M1602#4. 4-Fireblock vertically at 10' max spacing on double wall per R302.11#1.1.
March 30th: maintain 1" clearance around B-vent to combustibles
04/04/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed