Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Address:
3926 N EUCLID AV
Address NEW:
3926 N EUCLID AV
Apply Date:
09/01/2022
Applicant:
Adam Burkhalter
Description:
R-Sleeping Quarters

Permit Reviews

Permit Number - T22CM06765
Permit Status: Complete
Permit Description: R-Sleeping Quarters
Start Date Submittal Complete Date Status  
09/01/2022 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 09/23/2022 COMPLETED Review Details
10/13/2022 RESUBMITTAL 10/18/2022 COMPLETED Review Details

Conditions

Permit Number - T22CM06765
Permit Status: Complete
Permit Description: R-Sleeping Quarters
Date Description Comments
10/17/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM06765
Permite Description: R-Sleeping Quarters
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - RSBU - Excavation/Rebar/Zoning N/A Not Ready
10/26/2022 COT - RSEL - Electrical Underground N/A Not Ready
10/26/2022 COT - RSBU - Roof Nailing N/A Not Ready
12/06/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass 1-Need DWV test. 2-Need 18” minimum of copper, before transitioning to per at WH. OK to proceed in other areas.
10/26/2022 COT - RSBU - Stem Wall/Retaining Wall N/A Not Ready
10/27/2022 RSME - Mechanical Progress N/A Not Ready
10/26/2022 COT - HCBU - Interior Shear Bracing N/A Not Ready
12/28/2022 COT - RSEL - Electrical Final N/A Partial Pass Need to complete in wall electric and install electrical fixtures.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM06765
Permit Description: R-Sleeping Quarters
Total Completed Inspections - 13
Date Description Inspector Results Comments
11/17/2022 COT - RSBU - Excavation/Rebar/Zoning Passed 6 - 3’9” x 3’9” footings with rebar matts ok to pour for container sleeping quarters.
12/07/2022 COT - RSEL - Electrical Underground Passed
12/28/2022 COT - RSEL - Grounding/Bonding Passed
12/28/2022 COT - RSPL - Rough Soil Passed
12/28/2022 COT - LCBU - Framing Passed
12/28/2022 COT - RSEL - Outdoor Lighting Passed
01/20/2023 COT - RSBU - Roof Nailing Passed
01/20/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/20/2023 RSME - Mechanical Progress Passed
01/21/2023 COT - RSME - Mechanical Final Passed
01/21/2023 COT - RSEL - Electrical Final Passed
01/21/2023 RSBU - Building Final Passed corrections were made
01/21/2023 COT - RSPL - Plumbing Final Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
OBA 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUC CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUC PLANS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
OBA.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
STRUC CALCS.PDF DOCUMENTS VIEW
STRUC PLANS.PDF DOCUMENTS VIEW