Inspection History Details
Inspection Status: Not Ready
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | RSBU - Building Final | Not Ready | ||
| 01/18/2023 | RSBU - Building Final | Not Ready | missing shut off valve at cold line for water heater missing out door light fixture exterior receptacles have a hot/neutral reversed plumbing under neath kitchen sink needs to be replaced with abs pipe. finish anchoring bolts and tightened mini splits need to be installed and ready for finals |
|
| 01/21/2023 | RSBU - Building Final | Passed | corrections were made | |
| 12/28/2022 | RSBU - Building Final | Partial Pass | Need to complete all intermediate inspections |