Permit: T22CM06505
Permit Details
Apply Date:
08/23/2022
Applicant:
Denise Dunning
Description:
SFR F50A22 T22-M0021
Permit Reviews
Permit Number - T22CM06505
Permit Status: Issued
Permit Description: SFR F50A22 T22-M0021
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/03/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/09/2023 | REQUIRES RESUBMIT |
11/14/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 11/14/2023 | APPROVED |
10/25/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/30/2023 | APPROVED |
Conditions
Permit Number - T22CM06505
Permit Status: Issued
Permit Description: SFR F50A22 T22-M0021
Date | Description | Comments |
---|---|---|
08/23/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
08/23/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
08/23/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
10/30/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
10/30/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
10/30/2023 | Post-Tension Inspection Report is required. | |
10/30/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
10/30/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
10/30/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM06505
Permite Description: SFR F50A22 T22-M0021
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/13/2023 | COT - LCBU - Framing | N/A | Re-inspection required | no plans on site |
03/13/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | No plans on site 4 panel electrical switch needs support Vents |
07/27/2023 | RSBU - Building Final | N/A | Re-inspection required | 7/27/23: leak in irrigation by water hose bib. |
07/21/2023 | ENGR Engineering Final | N/A | Not Ready | complete all work as shown on the approved plans for grading and drainage for this site. Repair all damage sidewalks adjacent to this property and ensure that drainage to the sidewalk is not concentrated. Verify the site is a real lot draining site as is indicated by the rear lot drainage openings and provide rock riprap on filter fabric to the base of the slope on the outside of the property |
07/11/2023 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06505
Permit Description: SFR F50A22 T22-M0021
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/23/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/23/2022 | COT - RSPL - Sewer | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/23/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 09/23/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
10/06/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
10/06/2022 | COT - RSBU - Preslab | Passed | {Activity date: 10/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
10/06/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
10/06/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
01/17/2023 | COT - RSBU - Roof Nailing | Passed | ||
01/17/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
03/13/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
03/13/2023 | RSME - Mechanical Progress | Passed | ||
03/13/2023 | COT - RSEL - Construction Power | Passed | TEP ECO | |
04/05/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
07/11/2023 | COT - LCPL - Plumbing Intermediate | Passed | Passed based on inspection history. | |
07/11/2023 | COT - BULD - SWG Clearance | Passed | ||
07/21/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
07/27/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
07/27/2023 | COT - RSME - Mechanical Final | Passed | ||
07/27/2023 | COT - RSEL - Electrical Final | Passed | ||
07/27/2023 | ENGR Engineering Final | Passed |