Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 07/21/2023 |
ENGR Engineering Final
|
|
Not Ready |
complete all work as shown on the approved plans for grading and drainage for this site. Repair all damage sidewalks adjacent to this property and ensure that drainage to the sidewalk is not concentrated. Verify the site is a real lot draining site as is indicated by the rear lot drainage openings and provide rock riprap on filter fabric to the base of the slope on the outside of the property |
| 07/27/2023 |
ENGR Engineering Final
|
|
Passed |
|