Permit: T22CM06472
Permit Details
Apply Date:
08/22/2022
Applicant:
Description:
SFR LENNLE4003 T22-M0047
Outstanding Activity Conditions
Permit Number - T22CM06472
Permit Status: Issued
Permit Description: SFR LENNLE4003 T22-M0047
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
07/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/14/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
08/22/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
08/22/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
08/22/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
08/22/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-90/P21WP00062 IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM06472
Permite Description: SFR LENNLE4003 T22-M0047
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSPL - Sewer | N/A | Not Ready | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06472
Permit Description: SFR LENNLE4003 T22-M0047
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/26/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 08/26/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/26/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 08/26/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/06/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 09/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/06/2022 | COT - RSBU - Preslab | Passed | {Activity date: 09/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/06/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 09/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/06/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
10/20/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 10/20/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} ; {Activity date: 10/12/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Not ready. Ridge board is loose west end of building. Missing panel on perimeter, East end of building. } |
|
10/20/2022 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 10/20/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} ; {Activity date: 10/12/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Not ready. Missing clips south end of windows and studs. Secure any loose bottom plates. Shear wall cannot be less than 16". Missing clips downstairs bedroom door. Loose shear wall second floor. Add A 35 clips underneath stairway.} | |
03/22/2023 | BULD - Electrical Clearance | Passed | Approved. Clearance for TEP ECO. 3/22/2023 | |
03/22/2023 | COT - RSEL - Construction Power | Passed | Approved. Clearance for TEP ECO. 3/22/2023 | |
03/22/2023 | RSME - Mechanical Progress | Passed | ||
03/22/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
03/22/2023 | COT - LCBU - Framing | Passed | ||
03/23/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Approved. Corrections were made. 3/23/2023 | |
03/23/2023 | COT - LCPL - Plumbing Intermediate | Passed | Approved. Corrections were made. 3/23/2023 | |
04/03/2023 | COT - HCBU - Interior Shear Bracing | Passed | 4-3-23: Drywall is complete. Interior shear walls are properly screwed off. | |
04/24/2023 | COT - RSPL - Sewer | Passed | ||
07/11/2023 | COT - BULD - SWG Clearance | Passed | 7/11/23: SWG Clearance for meter only. | |
08/23/2023 | COT - RSPL - Plumbing Final | Passed | ||
08/23/2023 | COT - RSME - Mechanical Final | Passed | ||
08/23/2023 | ENGR Engineering Final | Passed | ||
08/23/2023 | COT - RSEL - Electrical Final | Passed | ||
08/23/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
08/24/2023 | RSBU - Building Final | Passed |