Inspection Status: Not Ready
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Not Ready |
|
| 03/22/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Not Ready |
Not ready. Add nail plates to electrical lines that are less than an 1” 1/4 from edge. Secure electrical lines that have slack. Provide DWV throughout second floor. Add straps to plumbing lines. Space pex lines minimum 12” from any can lights. Secure pex lines in kitchen area. Add blocking to registers going through second floor. Missing blocking at register in kitchen area and laundry room. 3/22/2023 |
| 03/23/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
Approved. Corrections were made. 3/23/2023 |