Permit: T22CM06066
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
434 N SPRING FLOWER DR
Address NEW:
434 N SPRING FLOWER DR
Apply Date:
08/09/2022
Applicant:
Description:
SFR MER1301600 T21-M0073 (Rev 1)
Permit Reviews
Permit Number - T22CM06066
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073 (Rev 1)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/20/2022 | RESIDENTIAL NEW DWELLING v.1 | 01/05/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - T22CM06066
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073 (Rev 1)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 08/09/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 08/09/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
| 08/09/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 08/09/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-095/P22WP00021 IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM06066
Permite Description: SFR MER1301600 T21-M0073 (Rev 1)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM06066
Permit Description: SFR MER1301600 T21-M0073 (Rev 1)
Total Completed Inspections - 24
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/07/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/03/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE} ; {Activity date: 09/28/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - Cancel all inspections. Building does not meet the site set-backs } |
|
| 10/07/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 10/07/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} ; {Activity date: 10/03/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - DE Install string line between all lots being inspected to show property pins} ; {Activity date: 09/28/2022; Status: Cancelled; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - Cancel all inspections. Building does not meet the site set-backs } |
|
| 10/18/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} | |
| 10/18/2022 | COT - RSBU - Preslab | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} | |
| 10/18/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} | |
| 10/18/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 10/18/2022; Status: Approved; Inspector: RCHANDLER; Comment: Entered by NGARCIA3 - AP} | |
| 01/13/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 01/13/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 02/22/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 02/22/2023 | RSME - Mechanical Progress | Passed | ||
| 02/22/2023 | COT - RSEL - Construction Power | Passed | ||
| 02/22/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 02/22/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
| 03/10/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 03/10/2023 | COT - LCBU - Framing | Passed | ||
| 03/14/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 04/21/2023 | COT - RSPL - Sewer | Passed | ||
| 05/03/2023 | COT - BULD - SWG Clearance | Passed | SWG clearance required | |
| 05/03/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 05/17/2023 | COT - RSME - Mechanical Final | Passed | ||
| 05/17/2023 | RSBU - Building Final | Passed | ||
| 05/17/2023 | COT - RSEL - Electrical Final | Passed | ||
| 05/17/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/19/2023 | ENGR Engineering Final | Passed | Inspector will approve combination permit at this time. Contractor needs to schedule inspections from the development package permit and make corrections to sidewalks as required. |