Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - HCBU - Interior Shear Bracing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | COT - HCBU - Interior Shear Bracing | Not Ready | ||
| 03/10/2023 | COT - HCBU - Interior Shear Bracing | Re-inspection required | Ceiling gypboard can not run parallel with framing, fasteners can not be within 3/8" of edge. | |
| 03/13/2023 | COT - HCBU - Interior Shear Bracing | Canceled | Ceiling gypboard can not run parallel with framing, fasteners can not be within 3/8" of edge. March 13th: cancel per Brit |
|
| 03/14/2023 | COT - HCBU - Interior Shear Bracing | Passed |