Permit: T22CM05553
Permit Details
Status:
Issued
Type:
Residential Building - One or Two Family
Address:
6679 E CAMINO ESTARNA
Address NEW:
6679 E CAMINO ESTARNA
Apply Date:
07/21/2022
Applicant:
Christi Swenson
Description:
SFR PULT3521-3 T21-M0049
Outstanding Activity Conditions
Permit Number - T22CM05553
Permit Status: Issued
Permit Description: SFR PULT3521-3 T21-M0049
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 07/21/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 07/21/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
| 07/21/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 07/21/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-089/P21WP00061 IS ACCEPTED AND RELEASED BY PCRWRD AND NO FINAL UNTIL THE DOWNSTREAMOFFSITE PUBLIC SEWER FOR PARCEL 4 G-2020-087 IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM05553
Permite Description: SFR PULT3521-3 T21-M0049
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2023 | ENGR Engineering Final | N/A | Complete (Recurring) | The sidewalk on the east side needs to be completed the Porta potty needs to be removed and the trash container need to be removed |
| 04/03/2023 | COT - RSEL - Outdoor Lighting | N/A | Canceled | Cancelled per Lorenzo. |
| 04/03/2023 | COT - RSPL - Plumbing Final | N/A | Not Ready | Not ready per Lorenzo. |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM05553
Permit Description: SFR PULT3521-3 T21-M0049
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/10/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 08/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 08/10/2022 | COT - RSPL - Sewer | Passed | {Activity date: 08/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 08/10/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 08/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 08/17/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 08/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 08/17/2022 | COT - RSBU - Preslab | Passed | {Activity date: 08/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 08/17/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 08/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 08/17/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 08/17/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP} | |
| 10/06/2022 | COT - RSBU - Roof Nailing | Passed | {Activity date: 10/06/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - approved} | |
| 10/10/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | {Activity date: 10/10/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} ; {Activity date: 10/06/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by NGARCIA3 - Not ready. Loose shear wall first floor. Loose sheets of plywood second floor. And more nails to bottom plates master bedroom closet. Missing titan bolts behind shear wall.} | |
| 12/16/2022 | COT - RSPL - Gas Pressure Test | Passed | holding 15 psi. | |
| 12/22/2022 | BULD - Electrical Clearance | Passed | ||
| 12/22/2022 | COT - LCBU - Framing | Passed | ||
| 12/22/2022 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 12/22/2022 | RSME - Mechanical Progress | Passed | ||
| 12/22/2022 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 12/22/2022 | COT - RSEL - Construction Power | Passed | clearance for TEP ECO. | |
| 01/20/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 04/10/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 04/10/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 04/12/2023 | COT - RSME - Mechanical Final | Passed | Approved. Corrections were made 4/12/2023 | |
| 04/12/2023 | RSBU - Building Final | Passed | Approved. Corrections were made 4/12/2023 | |
| 04/12/2023 | COT - RSEL - Electrical Final | Passed | Approved. Corrections were made 4/12/2023 |