Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - T22CM05553
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
04/03/2023 | ENGR Engineering Final | Complete (Recurring) | The sidewalk on the east side needs to be completed the Porta potty needs to be removed and the trash container need to be removed |