Permit Reviews

Permit Number - T22CM05455
Permit Status: Issued
Permit Description: SFR 235.2960 T21-M0055
Start Date Submittal Complete Date Status  
07/19/2022 OTHER 08/08/2022 COMPLETED Review Details
02/07/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/08/2024 APPROVED Review Details
04/28/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/02/2023 APPROVED Review Details
09/28/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/29/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T22CM05455
Permit Status: Issued
Permit Description: SFR 235.2960 T21-M0055
Total Outstanding Activity Conditions - 1
Date Name
07/19/2022 NO FINAL UNTIL THE PUBLIC SEWER G-2020-059/P21WP00060, G-20-089/P21WP00061 AND THE DOWNSTREAM OFFSITE PUBLIC SEWER FORPARCEL 4 G-2020-087 IS ACCEPTED AND RELEASED BY PCRWRD

Conditions

Permit Number - T22CM05455
Permit Status: Issued
Permit Description: SFR 235.2960 T21-M0055
Date Description Comments
07/19/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
07/19/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
07/19/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/02/2023 Post-Installed Anchor Inspection Report is required.
02/08/2024 Post-Tension Inspection Report is required.
09/29/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/02/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM05455
Permite Description: SFR 235.2960 T21-M0055
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
02/07/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 2/7/24
Tubs not under test
Shower test
Fresh air vent full of water
roof not loaded
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready

Completed Inspections

Permit Status: Issued
Permit Number: T22CM05455
Permit Description: SFR 235.2960 T21-M0055
Total Completed Inspections - 23
Date Description Inspector Results Comments
11/14/2023 COT - RSPL - Sewer Passed
11/14/2023 COT - RSPL - Yard Water Line Passed
11/14/2023 COT - RSPL - Rough Soil Passed
11/20/2023 COT - RSEL - Grounding/Bonding Passed
11/20/2023 COT - RSEL - Electrical Underground Passed
11/21/2023 COT - RSBU - Preslab Passed
11/21/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
12/14/2023 COT - RSBU - Roof Nailing Passed
01/03/2024 COT - RSBU - Exterior Clips/Sheathing Passed
02/07/2024 COT - LCBU - Framing Passed
02/07/2024 COT - RSEL - Construction Power Passed 2/27/24 ECO clearance sent to TEP
02/07/2024 COT - RSPL - Gas Pressure Test Passed
02/07/2024 RSME - Mechanical Progress Passed
02/09/2024 COT - LCPL - Plumbing Intermediate Passed
02/09/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/27/2024 COT - HCBU - Interior Shear Bracing Passed
04/15/2024 COT - BULD - SWG Clearance Passed
04/23/2024 COT - RSPL - Plumbing Final Passed
04/23/2024 RSBU - Building Final Passed
04/23/2024 COT - RSEL - Electrical Final Passed
04/23/2024 COT - RSEL - Outdoor Lighting Passed
04/23/2024 COT - RSME - Mechanical Final Passed
04/23/2024 ENGR Engineering Final Passed We need to be able to see a definite swale for drainage from rear to front yard. As expected;aimed I have several concerns on both sides of this one in the rear to side flow.

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
144045 PT LOT 68 COMPLETE-2024-02-06_V1.PDF DOCUMENTS VIEW
CONS-LOT 68 SPECIAL INSPECTION CERTIFICATE_V1.PDF DOCUMENTS VIEW
PATTISON SIC LETTER 9.27.23_V1.PDF DOCUMENTS VIEW
LOT 68 REVISED SPECIAL INSPECTION CERTIFICATE-2023-04-25_V1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW