Permit: T22CM05289
Permit Details
Apply Date:
07/13/2022
Applicant:
Andrea Flood
Description:
SFR STF40K T20-M0039
Permit Reviews
Permit Number - T22CM05289
Permit Status: Issued
Permit Description: SFR STF40K T20-M0039
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/14/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/14/2023 | REQUIRES RESUBMIT |
08/22/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/23/2023 | APPROVED |
Conditions
Permit Number - T22CM05289
Permit Status: Issued
Permit Description: SFR STF40K T20-M0039
Date | Description | Comments |
---|---|---|
07/13/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
07/13/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
07/13/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
08/22/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
07/13/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM05289
Permite Description: SFR STF40K T20-M0039
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - RSBU - Roof Nailing | N/A | Not Ready | |
10/26/2022 | COT - RSBU - Exterior Clips/Sheathing | N/A | Not Ready | |
08/15/2023 | COT - RSBU - Stem Wall/Retaining Wall | N/A | Not Applicable | |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM05289
Permit Description: SFR STF40K T20-M0039
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/04/2022 | COT - RSPL - Yard Water Line | Passed | {Activity date: 08/04/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/04/2022 | COT - RSPL - Sewer | Passed | {Activity date: 08/04/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
08/04/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 08/04/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/06/2022 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 09/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/06/2022 | COT - RSBU - Preslab | Passed | {Activity date: 09/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/06/2022 | COT - RSEL - Electrical Underground | Passed | {Activity date: 09/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
09/06/2022 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 09/06/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP} | |
04/07/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
04/07/2023 | COT - RSEL - Construction Power | Passed | ||
04/07/2023 | RSME - Mechanical Progress | Passed | ||
04/07/2023 | COT - LCPL - Plumbing Intermediate | Passed | ||
04/07/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
04/07/2023 | COT - LCBU - Framing | Passed | ||
04/26/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
07/20/2023 | COT - BULD - SWG Clearance | Passed | ||
08/15/2023 | ENGR Engineering Final | Passed | ||
08/15/2023 | COT - RSME - Mechanical Final | Passed | ||
08/15/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
08/15/2023 | COT - RSPL - Plumbing Final | Passed | ||
08/23/2023 | COT - RSEL - Electrical Final | Passed | Approved. Corrections were made. 8/23/2023 | |
08/23/2023 | RSBU - Building Final | Passed | Approved. Corrections were made. 8/23/2023 |