Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
07/07/2022
Applicant:
David Valencia
Description:
New Multi-Family BLDG #4

Permit Reviews

Permit Number - T22CM05109
Permit Status: Issued
Permit Description: New Multi-Family BLDG #4
Start Date Submittal Complete Date Status  
07/07/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 08/31/2022 COMPLETED Review Details
03/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/11/2024 APPROVED Review Details
11/10/2022 COMMERCIAL REVIEW - FULL v.1 12/28/2022 REQUIRES RESUBMIT Review Details
02/17/2023 COMMERCIAL REVIEW - FULL v.2 03/23/2023 APPROVED Review Details
05/02/2023 COMMERCIAL REVIEW - FULL v.1 05/10/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T22CM05109
Permit Status: Issued
Permit Description: New Multi-Family BLDG #4
Total Outstanding Activity Conditions - 14
Date Name
02/27/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
02/27/2023 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
02/27/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
02/27/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
02/27/2023 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
02/27/2023 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
02/27/2023 Post-Tension Inspection Report is required.
02/27/2023 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
02/27/2023 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
02/27/2023 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
02/27/2023 WATER STERILIZATION REPORT IS REQUIRED.
03/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/12/2023
12/12/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - T22CM05109
Permit Status: Issued
Permit Description: New Multi-Family BLDG #4
Date Description Comments
12/28/2022 PLEASE CONTACT PC ADDRESSING TO HAVE BUILDING NUMBER ASSIGNED PRIOR TO ISSUANCE Ph# 520-724-9512, EMAIL:ADDRESSING@PIMA.GOV}
01/06/2023 Plan review applications expire 180 days from date of submittal unless the permit has been issued. Permits expire 180 days after issuance or last approved inspection.
02/27/2023 I-Joists Designs must be submitted and approved prior to Final Inspection

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM05109
Permite Description: New Multi-Family BLDG #4
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
12/28/2023 COT - HCPL - Rough Soil N/A Canceled Canceled per contractor. 12/26/2023

Canceled per contractor. 12/27/2023

12/28/23: Canceled per contractor
04/26/2024 COT - HCBU - Firewall/Fire Barrier/Firestop N/A Not Applicable
07/17/2024 BULD - Electrical Clearance N/A Partial Pass UG only.
11/05/2024 COT - HCBU - Building Final N/A Re-inspection required

Completed Inspections

Permit Status: Issued
Permit Number: T22CM05109
Permit Description: New Multi-Family BLDG #4
Total Completed Inspections - 26
Date Description Inspector Results Comments
09/13/2023 COT - HCBU - Building Progress Passed
01/17/2024 COT - HCPL - Rough Soil Passed 1/17/24: okay to continue. All underground plumbing for Building #4 is complete.
01/19/2024 COT - HCBU - Preslab Passed
01/29/2024 COT - HCPL - Yard Water Line Passed
01/30/2024 COT - HCBU - Excavation/Rebar/Zoning Passed
01/30/2024 COT - HCEL - Grounding/Bonding Passed
02/09/2024 COT - HCPL - Plumbing Progress Passed yard line
03/13/2024 COT - HCPL - Plumbing Above Ceiling Passed Also intermediate.
03/14/2024 COT - HCPL - Plumbing Intermediate Passed
03/18/2024 COT - HCBU - Exterior Clips/Sheathing Passed
03/18/2024 COT - HCBU - Roof Nailing Passed
04/26/2024 COT - HCBU - Building Above Ceiling Passed
04/26/2024 COT - HCEL - Electrical Above Ceiling Passed
04/26/2024 COT - HCME - Mechanical Above Ceiling Passed
04/26/2024 COT - HCME - Mechanical Intermediate Passed
05/16/2024 COT - HCBU - Framing Passed
05/31/2024 COT - HCBU - Interior Shear Bracing Passed
06/12/2024 COT - HCEL - Electrical Progress Passed Conductors secured to panels.
09/03/2024 BULD - Electrical Clearance Passed
10/21/2024 COT - HCEL - Outdoor Lighting Passed
10/21/2024 COT - HCME - Mechanical Final Passed
11/01/2024 COT - HCEL - Electrical Final Passed
11/01/2024 COT - HCPL - Sewer Passed
11/01/2024 COT - HCPL - Plumbing Final Passed
11/07/2024 COT - FCON - Alarm - Final Passed
11/07/2024 COT - FCON - Sprinkler - Final Passed

Documents

File Name Document Type  
10357 RER - IJOISTS LAYOUT R2 - APPROVED AS NOTED_V1.PDF DOCUMENTS VIEW
10357 RER - IJOISTS LAYOUT R2 - APPROVED AS NOTED_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_PIMA INDUSTRIAL WASTE APPROVAL_V1 (1)_V1.PDF DOCUMENTS VIEW
2_COMMERCIAL-95-340-FR-PRODUCT-PROFILE-US-REV-1-MARCH-2020_V1_V1.PDF DOCUMENTS VIEW
2_DP22-0145 FOR REFERENCE ONLY_V1_V1.PDF DOCUMENTS VIEW
2_GEOTECHNICAL REPORT WITH ADDENDUM 1_V1_V1.PDF DOCUMENTS VIEW
2_SPECIFICATIONS 08 71 00 RESIDENCE_V1_V1.PDF DOCUMENTS VIEW
CONS-CONS-2_PLAN SET_V1_V1.PDF DOCUMENTS VIEW
SPAPP-2_T22CM05106 PERMIT REVIEW COMMENTS RESPONSE LETTER-2022-11-04_V1_V1.PDF DOCUMENTS VIEW