Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T22CM05109

Parcel: 121080610

Inspection Status: Passed

Inspection History: COT - HCPL - Rough Soil 

Permit Number - T22CM05109

Inspection Description - COT - HCPL - Rough Soil 

Inspection Status - Passed

Date Description Inspector Results Comments
01/17/2024 COT - HCPL - Rough Soil  Passed 1/17/24: okay to continue. All underground plumbing for Building #4 is complete.
12/26/2023 COT - HCPL - Rough Soil  Canceled Canceled per contractor. 12/26/2023
12/27/2023 COT - HCPL - Rough Soil  Canceled Canceled per contractor. 12/27/2023 ground too wet from rains on Friday.
12/28/2023 COT - HCPL - Rough Soil  Canceled Canceled per contractor. 12/26/2023

Canceled per contractor. 12/27/2023

12/28/23: Canceled per contractor
12/29/2023 COT - HCPL - Rough Soil  Partial Pass 12/29/23: Partial Pass--Building #4 U/G plumbing is properly installed and under a water test. Okay to shade pipe and backfill trenches.