Inspection Status: Passed
Inspection History: COT - HCPL - Rough Soil
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2024 | COT - HCPL - Rough Soil | Passed | 1/17/24: okay to continue. All underground plumbing for Building #4 is complete. | |
| 12/26/2023 | COT - HCPL - Rough Soil | Canceled | Canceled per contractor. 12/26/2023 | |
| 12/27/2023 | COT - HCPL - Rough Soil | Canceled | Canceled per contractor. 12/27/2023 ground too wet from rains on Friday. | |
| 12/28/2023 | COT - HCPL - Rough Soil | Canceled | Canceled per contractor. 12/26/2023 Canceled per contractor. 12/27/2023 12/28/23: Canceled per contractor |
|
| 12/29/2023 | COT - HCPL - Rough Soil | Partial Pass | 12/29/23: Partial Pass--Building #4 U/G plumbing is properly installed and under a water test. Okay to shade pipe and backfill trenches. |