Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Residential Building - One or Two Family
Apply Date:
07/02/2022
Applicant:
ramon polanco
Description:
SFR BRIOS1432 T20-M0059

Permit Reviews

Permit Number - T22CM05013
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Start Date Submittal Complete Date Status  
07/02/2022 OTHER 08/05/2022 COMPLETED Review Details
02/07/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/09/2024 APPROVED Review Details
02/27/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/04/2024 APPROVED Review Details

Conditions

Permit Number - T22CM05013
Permit Status: Complete
Permit Description: SFR BRIOS1432 T20-M0059
Date Description Comments
07/02/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
07/02/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
07/02/2022 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
07/02/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/02/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
07/02/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/02/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
07/26/2022 WATER METER SIZE
08/05/2022 Prior to permit issuance a General Contractor Letter (GCL) is required

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM05013
Permite Description: SFR BRIOS1432 T20-M0059
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
03/27/2023 COT - RSEL - Construction Power N/A Not Applicable
02/01/2024 COT - RSBU - Sustainability N/A Not Applicable
03/27/2023 COT - RSME - Mechanical Final N/A Not Ready
02/07/2024 RSBU - Building Final N/A Partial Pass TCO 3

Completed Inspections

Permit Status: Complete
Permit Number: T22CM05013
Permit Description: SFR BRIOS1432 T20-M0059
Total Completed Inspections - 20
Date Description Inspector Results Comments
03/27/2023 RSME - Mechanical Progress Passed
03/27/2023 COT - RSPL - Sewer Passed
03/27/2023 COT - RSPL - Rough Soil Passed
04/06/2023 COT - RSBU - Preslab Passed
04/06/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
05/02/2023 COT - RSBU - Roof Nailing Passed
05/02/2023 COT - RSBU - Exterior Clips/Sheathing Passed
10/16/2023 BULD - Electrical Clearance Passed Ok for clearance ECO
11/09/2023 COT - LCBU - Framing Passed
11/09/2023 COT - LCPL - Plumbing Intermediate Passed
11/09/2023 RSEL - Electrical Progress Passed
02/01/2024 COT - RSEL - Grounding/Bonding Passed
02/01/2024 COT - RSPL - Yard Water Line Passed
02/01/2024 COT - HCBU - Interior Shear Bracing Passed
02/01/2024 COT - RSEL - Electrical Underground Passed
02/02/2024 COT - RSME - Mechanical Final Passed
02/07/2024 COT - RSPL - Plumbing Final Passed
02/07/2024 COT - RSEL - Electrical Final Passed
02/13/2024 ENGR Engineering Final Passed
02/22/2024 RSBU - Building Final Passed Ok for C/O

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
139680 BUILDING 126-2024-02-21_V1.PDF DOCUMENTS VIEW
3 BEDROOM STRUCTURAL CALCS REV1_V1.PDF DOCUMENTS VIEW
BLDG 126 SIC-2024-02-05_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION T22CM05013.PDF DOCUMENTS VIEW
SIC BLDG 126.PDF DOCUMENTS VIEW
UTILITY PLAN 113-129.PDF DOCUMENTS VIEW