Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Engineering Final | Not Ready | ||
| 01/31/2024 | ENGR Engineering Final | Partial Pass | TC Of O Level 4 Clean landscape rock and debris from drainage block in courtyard and swale landscape from roof drain splash block to drainage block. Common area between buildings # 121 and # 129 will need to have large Caliche rocks removed from landscape rock and entire area floated and raked. |
|
| 01/31/2024 | ENGR Engineering Final | Passed | ||
| 02/13/2024 | ENGR Engineering Final | Passed |