Permit: T22CM04960
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
865 W DREXEL RD UNIT 2
Address NEW:
865 W DREXEL RD UNIT 2
Apply Date:
06/30/2022
Applicant:
Inai Maldonado
Description:
ADU Addition REV-1=Set back reduced
Permit Reviews
Permit Number - T22CM04960
Permit Status: Complete
Permit Description: ADU Addition REV-1=Set back reduced
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/30/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 07/25/2022 | COMPLETED |
| 08/03/2022 | RESUBMITTAL | 08/04/2022 | COMPLETED |
| 08/07/2022 | RESUBMITTAL | 08/08/2022 | COMPLETED |
| 12/01/2022 | RESIDENTIAL NEW DWELLING v.1 | 12/08/2022 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM04960
Permite Description: ADU Addition REV-1=Set back reduced
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2022 | COT - LCPL - Plumbing Intermediate | N/A | Canceled | {Activity date: 07/21/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
| 07/21/2022 | RSME - Mechanical Progress | N/A | Canceled | {Activity date: 07/21/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - } |
| 10/26/2022 | COT - RSEL - Grounding/Bonding | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Preslab | N/A | Not Ready | |
| 10/26/2022 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
| 10/26/2022 | COT - RSPL - Gas Pressure Test | N/A | Not Ready | |
| 10/26/2022 | COT - RSPL - Sewer | N/A | Not Ready | |
| 01/17/2023 | COT - RSEL - Construction Power | N/A | Not Ready | |
| 01/17/2023 | COT - RSEL - Electrical Underground | N/A | Not Ready | water in the footing. needs to be dry. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM04960
Permit Description: ADU Addition REV-1=Set back reduced
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/11/2022 | COT - RSPL - Rough Soil | Passed | {Activity date: 10/11/2022; Status: Approved; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Approved and connected to existing main line from house, okay to backfill progress areas} ; {Activity date: 09/26/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Stacks need to be under pressure filled with water to check for leaks.} | |
| 11/07/2022 | COT - RSEL - Grounding/Bonding | Passed | ||
| 11/07/2022 | COT - RSBU - Preslab | Passed | ||
| 12/08/2022 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Ok to cover exterior walls. | |
| 12/08/2022 | COT - RSBU - Roof Nailing | Passed | Ok to dry in roof system | |
| 12/08/2022 | COT - LCBU - Framing | Passed | Ok to install MEP intermediates. | |
| 01/04/2023 | COT - RSPL - Gas Pressure Test | Passed | N/A | |
| 01/04/2023 | COT - RSPL - Sewer | Passed | ||
| 01/04/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 01/23/2023 | COT - RSEL - Construction Power | Passed | unit #2 has electrical service for both dwelling units. The underground for unit 1 can be backfilled. The electrical rough-in for unit 2 is complete. | |
| 04/28/2023 | BULD - Electrical Clearance | Passed | Electrical panels are properly installed and grounded to earth. Okay to energize. | |
| 05/22/2023 | COT - RSME - Mechanical Final | Passed | A/C Unit is installed and operational. | |
| 05/22/2023 | COT - RSEL - Electrical Final | Passed | Electrical is complete and energized. | |
| 05/22/2023 | COT - RSPL - Plumbing Final | Passed | Plumbing is complete and operational | |
| 05/22/2023 | RSBU - Building Final | Passed | Building is complete. Okay to issue C of O. | |
| 05/22/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/22/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 05/22/2023 | COT - RSEL - Electrical Underground | Passed | Electrical underground is complete and energized |