Permit: T22CM04809
Permit Details
Apply Date:
06/24/2022
Applicant:
Dennis Caldwell Jr
Description:
INTERIOR TENANT IMPROVEMENT ONLY. ALL SITE CONDITIONS TO REMAIN.
Permit Reviews
Permit Number - T22CM04809
Permit Status: Complete
Permit Description: INTERIOR TENANT IMPROVEMENT ONLY. ALL SITE CONDITIONS TO REMAIN.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/24/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 08/09/2022 | COMPLETED |
09/14/2022 | RESUBMITTAL | 09/27/2022 | COMPLETED |
03/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/11/2024 | APPROVED |
02/04/2023 | COMMERCIAL REVIEW - FULL v.1 | 03/07/2023 | REQUIRES RESUBMIT |
03/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/05/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - T22CM04809
Permit Status: Complete
Permit Description: INTERIOR TENANT IMPROVEMENT ONLY. ALL SITE CONDITIONS TO REMAIN.
Date | Description | Comments |
---|---|---|
09/26/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. | |
09/26/2022 | SPECIAL INSPECTION IS REQUIRED - AIR BALANCE REPORT REQUIRED PRIOR TO FINAL INSPECTION. | |
09/26/2022 | SPECIAL INSPECTION IS REQUIRED FOR WATER CHLORINATION REPORT REQUIRED PRIOR TO FINAL INSPECTION. | |
09/26/2022 | SHOP DRAWINGS REQUIRED FOR FIRE SPRINKLERS | |
09/26/2022 | SHOP DRAWINGS REQUIRED FOR FIRE ALARM | |
09/26/2022 | SHOP DRAWINGS REQUIRED FOR SIGNAGE | |
09/27/2022 | Prior to permit issuance a General Contractor Letter (GCL) is required |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM04809
Permite Description: INTERIOR TENANT IMPROVEMENT ONLY. ALL SITE CONDITIONS TO REMAIN.
Total Outstanding Inspections - 17
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/07/2023 | COT - LCME - Mechanical Above Ceiling | N/A | Canceled | |
07/07/2023 | COT - LCEL - Electrical Above Ceiling | N/A | Canceled | |
07/07/2023 | COT - LCPL - Plumbing Above Ceiling | N/A | Canceled | |
10/26/2022 | COT - FCON - Sprinkler - Final | N/A | Not Ready | |
10/26/2022 | COT - FCON - Alarm - Final | N/A | Not Ready | |
10/26/2022 | COT - LCPL - Plumbing Final | N/A | Not Ready | |
01/12/2023 | COT - LCBU - Framing | N/A | Partial Pass | partial for hard lid framing in hallway number 114 |
07/19/2023 | COT - LCBU - Building Above Ceiling | N/A | Not Ready | |
03/02/2023 | COT - LCEL - Electrical Progress | N/A | Partial Pass | Storage racks in warehouse complete; Ok to install electric equipment. |
01/12/2023 | COT - HCBU - Interior Shear Bracing | N/A | Partial Pass | room 103 - 124. okay partial for hard lid in hallway 114. |
01/12/2023 | COT - LCBU - Building Progress | N/A | Partial Pass | ready for tape on drywall. |
10/27/2022 | COT - LCEL - Electrical Final | N/A | Not Ready | |
10/26/2022 | COT - LCEL - Electrical Intermediate | N/A | Not Ready | |
10/26/2022 | COT - LCME - Mechanical Progress | N/A | Not Ready | |
10/27/2022 | COT - LCPL - Plumbing Intermediate | N/A | Not Ready | |
10/26/2022 | COT - LCME - Mechanical Final | N/A | Not Ready | |
02/21/2024 | COT - LCBU - Building Final | N/A | Partial Pass | 2/20/24: Air balance report and water sterilization report required prior to final inspection. Pending fire final 2/20/24: condensate drains must be properly supported and coated for UV protection. Electrical whips must be properly supported off of roof. 2/21/24: pending Air balance report and water sterilization report per permit conditions. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM04809
Permit Description: INTERIOR TENANT IMPROVEMENT ONLY. ALL SITE CONDITIONS TO REMAIN.
Total Completed Inspections - 22