Permit: T22CM04809

Parcel: 140420270

Inspection Status: Not Ready

Inspection History: COT - LCBU - Building Final 

Date Description Inspector Results Comments
10/27/2022 COT - LCBU - Building Final  Not Ready
02/20/2024 COT - LCBU - Building Final  Re-inspection required 2/20/24: Air balance report and water sterilization report required prior to final inspection. Pending fire final.
2/20/24: condensate drains must be properly supported and coated for UV protection. Electrical whips must be properly supported off of roof.
02/21/2024 COT - LCBU - Building Final  Partial Pass 2/20/24: Air balance report and water sterilization report required prior to final inspection. Pending fire final
2/20/24: condensate drains must be properly supported and coated for UV protection. Electrical whips must be properly supported off of roof.
2/21/24: pending Air balance report and water sterilization report per permit conditions.