Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - LCBU - Building Final
Permit Number - T22CM04809
Inspection Description - COT - LCBU - Building Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - LCBU - Building Final | Not Ready | ||
02/20/2024 | COT - LCBU - Building Final | Re-inspection required | 2/20/24: Air balance report and water sterilization report required prior to final inspection. Pending fire final. 2/20/24: condensate drains must be properly supported and coated for UV protection. Electrical whips must be properly supported off of roof. |
|
02/21/2024 | COT - LCBU - Building Final | Partial Pass | 2/20/24: Air balance report and water sterilization report required prior to final inspection. Pending fire final 2/20/24: condensate drains must be properly supported and coated for UV protection. Electrical whips must be properly supported off of roof. 2/21/24: pending Air balance report and water sterilization report per permit conditions. |