Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Residential Building - One or Two Family
Apply Date:
06/23/2022
Applicant:
Christi Swenson
Description:
SFR PULT3513-2 T21-M0056

Conditions

Permit Number - T22CM04752
Permit Status: Issued
Permit Description: SFR PULT3513-2 T21-M0056
Date Description Comments
06/23/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/23/2022 ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I)
06/23/2022 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/23/2022 NO FINALUNTIL THE PUBLIC SEWER G-2020-089/P21WP00061 IS ACCEPTED AND RELEASED BY PCRWRD ANDNO FINAL UNTIL THE DOWNSTREAM OFFSITE PUBLIC SEWER FOR PARCEL 4 G-2020-087 IS ACCEPTEDAND RELEASED BY PCRWRD

Outstanding Inspections

Permit Status: Issued
Permit Number: T22CM04752
Permite Description: SFR PULT3513-2 T21-M0056
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - HCBU - Interior Shear Bracing N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready
03/27/2023 ENGR Engineering Final N/A Complete (Recurring) All sidewalks need to be in before release. The sidewalks on the corner and sidewalks installed on the West

Completed Inspections

Permit Status: Issued
Permit Number: T22CM04752
Permit Description: SFR PULT3513-2 T21-M0056
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/12/2022 COT - RSPL - Yard Water Line Passed {Activity date: 07/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
07/12/2022 COT - RSPL - Sewer Passed {Activity date: 07/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
07/12/2022 COT - RSPL - Rough Soil Passed {Activity date: 07/12/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
07/19/2022 COT - RSEL - Grounding/Bonding Passed {Activity date: 07/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
07/19/2022 COT - RSBU - Preslab Passed {Activity date: 07/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
07/19/2022 COT - RSEL - Electrical Underground Passed {Activity date: 07/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
07/19/2022 COT - RSBU - Excavation/Rebar/Zoning Passed {Activity date: 07/19/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP}
08/10/2022 COT - RSBU - Roof Nailing Passed {Activity date: 08/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/10/2022 COT - LCBU - Framing Passed {Activity date: 08/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
08/10/2022 COT - RSBU - Exterior Clips/Sheathing Passed {Activity date: 08/10/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by VVERA1 - AP}
10/03/2022 COT - LCPL - Plumbing Intermediate Passed {Activity date: 10/03/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved}
10/03/2022 COT - RSPL - Gas Pressure Test Passed {Activity date: 10/03/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Approved}
10/05/2022 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed {Activity date: 10/05/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} ; {Activity date: 10/04/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE
1. Install anchor bolt within 12 inches of the end of all shear walls
2. Duct not connected
3. Line set not connected} ; {Activity date: 10/03/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Fresh air intake needs to be replaced due to water trapped.}
10/05/2022 RSME - Mechanical Progress Passed {Activity date: 10/05/2022; Status: Approved; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - approved} ; {Activity date: 10/04/2022; Status: Denied; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - DE} ; {Activity date: 10/03/2022; Status: Not ready for Inspection; Inspector: SCARRAZCO; Comment: Entered by VVERA1 - Not ready. Fresh air intake needs to be replaced due to water trapped. Block register at the intake.}
10/18/2022 PDSD Building Division - TEP PM Clearance Passed {Activity date: 10/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - CODE ECO}
10/18/2022 COT - RSEL - Construction Power Passed {Activity date: 10/18/2022; Status: Approved; Inspector: TLUNDBERG; Comment: Entered by NGARCIA3 - AP
TEP ECO}
03/08/2023 COT - RSEL - Outdoor Lighting Passed
03/08/2023 COT - RSPL - Plumbing Final Passed
06/30/2023 COT - RSME - Mechanical Final Passed
03/14/2023 RSBU - Building Final Passed
03/14/2023 COT - RSEL - Electrical Final Passed

Documents

File Name Document Type  
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SITE PLAN 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SITE PLAN.PDF DOCUMENTS VIEW