Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 10/05/2022 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
SCARRAZCO |
Approved |
Entered by VVERA1 - approved |
| 10/04/2022 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
TLUNDBERG |
Denied |
Entered by NGARCIA3 - DE
1. Install anchor bolt within 12 inches of the end of all shear walls
2. Duct not connected
3. Line set not connected |
| 10/03/2022 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
SCARRAZCO |
Not ready for Inspection |
Entered by VVERA1 - Not ready. Fresh air intake needs to be replaced due to water trapped. |