Permit: T22CM04698
Permit Details
Apply Date:
06/22/2022
Applicant:
jamie normand
Description:
SFR 235.2960 T21-M0055
Permit Reviews
Permit Number - T22CM04698
Permit Status: Issued
Permit Description: SFR 235.2960 T21-M0055
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/22/2022 | OTHER | 08/08/2022 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T22CM04698
Permit Status: Issued
Permit Description: SFR 235.2960 T21-M0055
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
06/22/2022 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
06/22/2022 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
06/22/2022 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
06/22/2022 | NO FINAL UNTIL THE PUBLIC SEWER G-2020-059/P21WP00060, G-20-089/P21WP00061 AND THE DOWNSTREAM OFFSITE PUBLIC SEWER FORPARCEL 4 G-2020-087 IS ACCEPTED AND RELEASED BY PCRWRD |
Outstanding Inspections
Permit Status: Issued
Permit Number: T22CM04698
Permite Description: SFR 235.2960 T21-M0055
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/23/2023 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | install MASA clips around perimeter |
02/23/2023 | COT - RSBU - Preslab | N/A | Re-inspection required | install MASA clips around perimeter |
04/20/2023 | COT - RSEL - Construction Power | N/A | Not Applicable | |
02/24/2023 | COT - RSEL - Electrical Underground | N/A | Not Ready | provide approved plans on site |
10/27/2022 | COT - RSPL - Plumbing Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: T22CM04698
Permit Description: SFR 235.2960 T21-M0055
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/14/2023 | COT - RSPL - Rough Soil | Passed | ||
02/23/2023 | COT - RSPL - Yard Water Line | Passed | ||
02/23/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
02/27/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
02/27/2023 | COT - RSBU - Preslab | Passed | okay to pour concrete in slab. | |
03/10/2023 | COT - RSBU - Roof Nailing | Passed | ||
03/23/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | Approved 3/23/2023 | |
04/20/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
04/20/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
04/20/2023 | COT - RSPL - Sewer | Passed | ||
04/26/2023 | COT - LCBU - Framing | Passed | 4-26-23: Fire blocking has been installed at stairs, landing, and register. Loose wire has been attached to stud on second floor. B-vent has been installed on second floor top plate. All abandoned flex duct has been removed from attic space. | |
04/26/2023 | COT - LCPL - Plumbing Intermediate | Passed | 4-26-23: Fire blocking has been installed at stairs, landing, and register. Loose wire has been attached to stud on second floor. B-vent has been installed on second floor top plate. All abandoned flex duct has been removed from attic space. | |
04/26/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4-26-23: Fire blocking has been installed at stairs, landing, and register. Loose wire has been attached to stud on second floor. B-vent has been installed on second floor top plate. All abandoned flex duct has been removed from attic space. | |
04/26/2023 | RSME - Mechanical Progress | Passed | 4-26-23: Fire blocking has been installed at stairs, landing, and register. Loose wire has been attached to stud on second floor. B-vent has been installed on second floor top plate. All abandoned flex duct has been removed from attic space. | |
05/09/2023 | COT - HCBU - Interior Shear Bracing | Passed | ||
07/18/2023 | COT - BULD - SWG Clearance | Passed | 7/18/23: swg clearance for meter only. | |
07/24/2023 | RSBU - Building Final | Passed | 7/24/23: Thermostats must be at 54". OC in height. Per plans. | |
07/24/2023 | COT - RSME - Mechanical Final | Passed | 7/24/23: Thermostats must be at 54". OC in height. Per plans. | |
07/24/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
07/24/2023 | COT - RSEL - Electrical Final | Passed |